Planned interruptions

SA Power Networks is committed to providing a safe and reliable electricity supply for South Australians.  To do this, there are times when we need to interrupt your power supply - usually for upgrades of the electricity network to meet future demand; to ensure the quality of supply (within Australian voltage standards); to connect new customers; or for planned maintenance of the network, which minimises the risk of unplanned outages.

We make every effort to ensure information on upcoming planned work is accurate at the time published.

If you are checking for today's planned work, you will find the status to be blank.  For work today where the power has already been interrupted, please check our current power interruptions page or contact our 24 hour faults and emergencies number 13 13 66.

For upcoming work, please note that the times provided on written notifications and below are the maximum anticipated outage times. Power may be turned off later than advised, and be restored either earlier than advised or, in rare cases, later than advised if there has been a complication.

Please note, planned work may not proceed in extreme weather or due to unforeseen circumstances.

We recommend that you plan for the outage to last the entire estimated duration and register with Power@MyPlace™ for SMS updates on outages affecting your property.

Future Planned Power Interruptions

JobFeedersApproximate Start TimeAreas AffectedEstimated Number of Customers AffectedApproximate Restoration TimeReasonStatus
14886MV6230/09/2014 08:00 ALDINGA BEACH230/10/2014 15:00maintain/upgrade the local electricity network
13316BS0204, SSD49520/10/2014 07:30027/10/2014 17:00install new electricity infrastructureCancelled
15303AP372D25/10/2014 23:00 WOODVILLE
 WOODVILLE PARK
1026/10/2014 05:00maintain/upgrade the local electricity network
15783CL08, CL1326/10/2014 08:00 ANDREWS
 HILL RIVER
 HILLTOWN
3026/10/2014 12:00maintain/upgrade the local electricity network
14715KA2426/10/2014 08:00 BUMBUNGA
 CONDOWIE
 EVERARD CENTRAL
 NANTAWARRA
 SNOWTOWN
3326/10/2014 12:30maintain/upgrade the local electricity networkCancelled
15338AP226B, AP226C, SSD22626/10/2014 08:00 ETHELTON
 GLANVILLE
1026/10/2014 15:00maintain/upgrade the local electricity network
14618HH121F26/10/2014 08:00 PARADISE8726/10/2014 15:00install new electricity infrastructure
14054GA22, GA26, SD1652, SSD104, SSD230, TSD1026/10/2014 08:00 EVANSTON GARDENS8026/10/2014 15:00install new electricity infrastructure
12041AP424B, AP425D, SSD424, SSD42526/10/2014 08:00 SEATON8526/10/2014 15:00maintain/upgrade the local electricity network
14101CBD367K, CBD367L, SSD36726/10/2014 08:00 ADELAIDE
  • PIRIE ST
126/10/2014 16:00maintain/upgrade the local electricity network
15667PL0426/10/2014 08:30 PORT LINCOLN
 TULKA
2426/10/2014 15:00improve the quality and/or reliability of the power supply
13666HH177C26/10/2014 08:30 PARA HILLS5426/10/2014 15:00maintain/upgrade the local electricity network
15637KA0726/10/2014 12:31 BARUNGA GAP
 BUMBUNGA
 EVERARD CENTRAL
 LOCHIEL
 NANTAWARRA
 PORT WAKEFIELD
 SNOWTOWN
 SOUTH HUMMOCKS
7626/10/2014 15:00maintain/upgrade the local electricity network
15394MT06, SSD30927/10/2014 07:30 TIDDY WIDDY BEACH427/10/2014 09:30improve the quality and/or reliability of the power supplyScheduled
15137BU0827/10/2014 08:00 BURRA527/10/2014 11:00maintain/upgrade the local electricity networkScheduled
14289GA1027/10/2014 08:00 LYNDOCH
 WILLIAMSTOWN
2027/10/2014 12:00improve the quality and/or reliability of the power supplyScheduled
15134BM3527/10/2014 08:00 GLOSSOP227/10/2014 12:30improve the quality and/or reliability of the power supplyScheduled
15050BM4427/10/2014 08:00 MONASH127/10/2014 13:00maintain/upgrade the local electricity networkScheduled
14908NU3527/10/2014 08:00 STEINFELD227/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15293NL111Q27/10/2014 08:00 REYNELLA927/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14762HH102A27/10/2014 08:00 BROADVIEW
 NAILSWORTH
1727/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14727KI5427/10/2014 08:00 KARATTA
 PARNDANA
 VIVONNE BAY
1827/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15317AP529E27/10/2014 08:00 SEMAPHORE427/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15319AP529E27/10/2014 08:00 LARGS BAY227/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15321AP529E27/10/2014 08:00 LARGS BAY327/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15390NU0427/10/2014 08:00 ANGASTON
 LIGHT PASS
 PENRICE
 STOCKWELL
3127/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15466NL210A27/10/2014 08:00 COROMANDEL VALLEY1227/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15517NU2427/10/2014 08:00 DAVEYSTON
 GOMERSAL
 LYNDOCH
 ROWLAND FLAT
 SEPPELTSFIELD
 SHEA-OAK LOG
 TANUNDA
7627/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15527AP529E27/10/2014 08:00 SEMAPHORE2127/10/2014 15:00maintain/upgrade the local electricity networkScheduled
11445SD5230127/10/2014 08:00 TANUNDA127/10/2014 15:00maintain/upgrade the local electricity networkCancelled
13184SD3320427/10/2014 08:00 BLYTH
 KYBUNGA
1327/10/2014 15:00install new electricity infrastructureScheduled
15534MTB41, SSD71927/10/2014 08:30 BALHANNAH
 VERDUN
4227/10/2014 14:00maintain/upgrade the local electricity networkScheduled
15333HH386B27/10/2014 08:30 HAZELWOOD PARK
 TUSMORE
2527/10/2014 15:00maintain/upgrade the local electricity networkScheduled
12867ST1327/10/2014 08:30 STRATHALBYN027/10/2014 15:00install new electricity infrastructureCancelled
14946ME347C27/10/2014 09:30 HILTON
 MILE END
127/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15095HH121G27/10/2014 09:30 CAMPBELLTOWN127/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15211SD32201, SD3220227/10/2014 10:00027/10/2014 14:30improve the quality and/or reliability of the power supplyCancelled
15675SD3220227/10/2014 10:00 YONGALA227/10/2014 14:30maintain/upgrade the local electricity networkScheduled
15138BU0827/10/2014 11:01 BURRA527/10/2014 13:00maintain/upgrade the local electricity networkScheduled
15605HH432B27/10/2014 12:00 PROSPECT5227/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15139BU0827/10/2014 13:01 PINE CREEK327/10/2014 15:00maintain/upgrade the local electricity networkScheduled
11497AP125A, AP125B, AP510D, SSD125, SSD51028/10/2014 08:00 NORTH HAVEN26428/10/2014 10:00maintain/upgrade the local electricity networkScheduled
15663MT2228/10/2014 08:00 MAITLAND228/10/2014 13:00maintain/upgrade the local electricity networkScheduled
15019HH107C28/10/2014 08:00 BROADVIEW7428/10/2014 15:00install new electricity infrastructureScheduled
15153AP529E28/10/2014 08:00 LARGS BAY3928/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14976AP529E28/10/2014 08:00 LARGS BAY4728/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15125BU09, BU1328/10/2014 08:00 BOOBOROWIE
 NORTH BOOBOROWIE
3128/10/2014 15:00maintain/upgrade the local electricity networkScheduled
10750HH121C, SSD12128/10/2014 08:00 PARADISE9628/10/2014 15:00repair underground infrastructureScheduled
15818BU0328/10/2014 08:00028/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14729EL11, SSD10428/10/2014 08:00 ULEYBURY128/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
12817GU5128/10/2014 08:00 HIGHBURY
 HOUGHTON
 PARACOMBE
1328/10/2014 15:00maintain/upgrade the local electricity networkScheduled
11086CBD103C, HH432B, HH432F, SSD43228/10/2014 08:00 PROSPECT11428/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15114NL111P28/10/2014 08:00 LONSDALE
 MORPHETT VALE
2028/10/2014 15:00install new electricity infrastructureScheduled
15724HH121C28/10/2014 08:00 PARADISE1328/10/2014 15:00repair underground infrastructureScheduled
15448GA0828/10/2014 08:00 WILLIAMSTOWN1328/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15530AP529E28/10/2014 08:00 LARGS BAY
 SEMAPHORE
1328/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15477R3628/10/2014 08:00 WILD HORSE PLAINS128/10/2014 15:00maintain/upgrade the local electricity networkScheduled
11766G1128/10/2014 08:30 CRYSTAL BROOK
 NARRIDY
1728/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15472SM126C28/10/2014 08:30 COROMANDEL EAST
 COROMANDEL VALLEY
1828/10/2014 15:00provide a safe working environment for customers to access equipmentScheduled
15164SA1428/10/2014 08:30 SALISBURY
 SALISBURY HEIGHTS
8328/10/2014 15:00install new electricity infrastructureScheduled
14376SSD368, VH18, VH3328/10/2014 08:30 BACK VALLEY
 PARAWA
 WAITPINGA
 WILLOW CREEK
9928/10/2014 15:00maintain/upgrade the local electricity networkScheduled
13769MB7128/10/2014 08:30 JERVOIS
 THE POINT
 WOODS POINT
5228/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15245G2128/10/2014 09:00 BEETALOO128/10/2014 15:00install new electricity infrastructureScheduled
15398YK1628/10/2014 09:15 CORNY POINT
 THE PINES
 WAROOKA
 WHITE HUT
8828/10/2014 09:20maintain/upgrade the local electricity networkScheduled
14927GA0828/10/2014 12:01 WILLIAMSTOWN128/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15398YK1628/10/2014 14:55028/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15322CBD367G28/10/2014 22:01 ADELAIDE
  • RUNDLE MALL
129/10/2014 04:30provide a safe working environment for customers to access equipmentScheduled
13650MG05, MG10, SSD19529/10/2014 06:00029/10/2014 18:00install new electricity infrastructureScheduled
15210CL2029/10/2014 08:00 SNOWTOWN
 WOKURNA
629/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14901AP132D29/10/2014 08:00 OTTOWAY129/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14992GU4329/10/2014 08:00 LOBETHAL729/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15144AP529E29/10/2014 08:00 LARGS BAY2829/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15142M0429/10/2014 08:00 MANNUM129/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15140ME231E29/10/2014 08:00 GLENELG
 GLENELG NORTH
2129/10/2014 15:00maintain/upgrade the local electricity networkScheduled
13266HH121E29/10/2014 08:00 CHERRYVILLE
 MONTACUTE
 NORTON SUMMIT
12429/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15678AP529B29/10/2014 08:00 LARGS NORTH5429/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15680AP529B29/10/2014 08:00 LARGS NORTH5429/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15120NL111P, NL111Q, SSD11129/10/2014 08:00 MORPHETT VALE
 REYNELLA
23829/10/2014 15:00install new electricity infrastructureCancelled
11175HH148A, HH409A, HH409E, SSD40929/10/2014 08:00 ROSSLYN PARK
 WATTLE PARK
9329/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15459SM349H29/10/2014 08:00 SEACLIFF PARK4329/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15710HH121E29/10/2014 08:00 NEWTON1029/10/2014 15:00repair underground infrastructureScheduled
15265SSD248, ST3529/10/2014 08:00 KUITPO COLONY
 MEADOWS
 MOUNT COMPASS
 MOUNT MAGNIFICENT
 NANGKITA
 PROSPECT HILL
 WILLUNGA
 YUNDI
2829/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15707HH522B29/10/2014 08:00 HIGHBURY
 HOPE VALLEY
4929/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15328AP226E, SSD22629/10/2014 08:00 SEMAPHORE
 SEMAPHORE SOUTH
12529/10/2014 15:00maintain/upgrade the local electricity networkScheduled
12981HH496D29/10/2014 08:00 WYNN VALE1429/10/2014 15:00repair underground infrastructureScheduled
15768HH522B, SSD52229/10/2014 08:00029/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15489EL0929/10/2014 08:00029/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15316GA40, NIL29/10/2014 08:00 KORUNYE129/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15155MB0229/10/2014 08:30029/10/2014 14:30maintain/upgrade the local electricity networkScheduled
15436HH177A29/10/2014 08:30 PARA HILLS11429/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13106AP226C, SSD22629/10/2014 08:30 ETHELTON
 SEMAPHORE PARK
10329/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15187VH1229/10/2014 08:30 HAYBOROUGH
 MCCRACKEN
 VICTOR HARBOR
1829/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14928SM349F29/10/2014 08:30 MARINO3429/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15830G15, G2429/10/2014 09:00029/10/2014 09:15improve the quality and/or reliability of the power supplyScheduled
15830G15, G2429/10/2014 09:16 CALTOWIE
 CALTOWIE WEST
4829/10/2014 10:00improve the quality and/or reliability of the power supplyScheduled
15127HH409C29/10/2014 09:30 TRANMERE129/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15123SM216A29/10/2014 09:30 NORTH BRIGHTON
 WARRADALE
129/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15742G1429/10/2014 10:00 BELALIE EAST
 HALLETT
029/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13987PA2229/10/2014 10:30 QUORN129/10/2014 12:25improve the quality and/or reliability of the power supplyCancelled
15516BT12, BT15, BT20, BT22, BT32, NA1229/10/2014 10:45 BRIMBAGO
 CAREW
 KEILIRA
 KEITH
 KEPPOCH
 LOCHABER
 MARCOLLAT
 NARACOORTE
 PADTHAWAY
 PETHERICK
 TARATAP
 TILLEY SWAMP
 WESTERN FLAT
 WILLALOOKA
75329/10/2014 11:00provide safe access to the electricity network for 5 to 15 minutesCancelled
15231GU4329/10/2014 11:00 LENSWOOD129/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15401ST4430/10/2014 08:00030/10/2014 11:00maintain/upgrade the local electricity networkScheduled
15536AP529E30/10/2014 08:00 SEMAPHORE330/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15148MB6430/10/2014 08:00 COOKE PLAINS230/10/2014 15:00install new electricity infrastructureScheduled
15158NL111P, NL115C30/10/2014 08:00 MORPHETT VALE7230/10/2014 15:00install new electricity infrastructureScheduled
15629AP351D30/10/2014 08:00 WOODVILLE WEST14430/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15650ST1130/10/2014 08:00 MACCLESFIELD
 MEADOWS
 PARIS CREEK
3230/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15234NA0330/10/2014 08:00 WILD DOG VALLEY530/10/2014 15:00provide a safe working environment for customers to access equipmentScheduled
13050GA0830/10/2014 08:00 WILLIAMSTOWN4530/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14846HH177E, HH177F, SSD17730/10/2014 08:00 POORAKA16230/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13613AP425B, ME347C, SSD347, SSD42530/10/2014 08:00 BROOKLYN PARK
 LOCKLEYS
22330/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14221MV53, SSD41330/10/2014 08:00 DINGABLEDINGA
 HOPE FOREST
 KUITPO
 KYEEMA
 MEADOWS
 WILLUNGA
5130/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14991GU3230/10/2014 08:00 MOUNT PLEASANT230/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15150MT1930/10/2014 08:30030/10/2014 09:30maintain/upgrade the local electricity networkScheduled
15264GA4330/10/2014 08:30 LEWISTON230/10/2014 15:00maintain/upgrade the local electricity networkScheduled
13620SSD340, VH2330/10/2014 08:30 MIDDLETON31230/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15181VH1230/10/2014 08:30 MCCRACKEN
 VICTOR HARBOR
530/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15047MT0130/10/2014 08:30 PORT VICTORIA130/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14387AP226C30/10/2014 08:30 ETHELTON
 PORT ADELAIDE
2830/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14677KA0430/10/2014 08:30 MOONTA
 MOONTA BAY
 NORTH MOONTA
4430/10/2014 15:30install new electricity infrastructureScheduled
15253W0330/10/2014 09:00 LOCK530/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14451SM172C30/10/2014 09:30 ASCOT PARK
 EDWARDSTOWN
130/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15124ME131D30/10/2014 09:30 CAMDEN PARK
 NORTH PLYMPTON
 PLYMPTON
130/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15344SSD340, VH2230/10/2014 10:00 GOOLWA12230/10/2014 12:30maintain/upgrade the local electricity networkScheduled
14978MV6230/10/2014 11:00 ALDINGA BEACH
 SELLICKS BEACH
330/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14652KA0131/10/2014 08:00 WALLAROO331/10/2014 10:00maintain/upgrade the local electricity networkScheduled
14930NU0331/10/2014 08:00 GREENOCK331/10/2014 13:00maintain/upgrade the local electricity networkScheduled
15515BT0231/10/2014 08:00 KONGAL231/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14306EL03, EL260B, EL260C31/10/2014 08:00 ANDREWS FARM
 DAVOREN PARK
3731/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15537AP529E31/10/2014 08:00 SEMAPHORE1331/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15311HH102C, HH341E, HH341K, SSD102, SSD34131/10/2014 08:00 JOSLIN
 ST PETERS
10831/10/2014 15:00install new electricity infrastructureScheduled
15201R1431/10/2014 08:00 BUCHANAN
 HANSBOROUGH
1131/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14747NL210C, SSD21031/10/2014 08:00 FLAGSTAFF HILL5431/10/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14680R3331/10/2014 08:00031/10/2014 15:00maintain/upgrade the local electricity networkScheduled
13377NL234C31/10/2014 08:00 PORT NOARLUNGA SOUTH3331/10/2014 15:00maintain/upgrade the local electricity networkScheduled
13180AP227A, AP344D, AP344E, SSD22731/10/2014 08:00 PORT ADELAIDE
 QUEENSTOWN
731/10/2014 15:00maintain/upgrade the local electricity networkScheduled
12358CM1131/10/2014 08:00031/10/2014 15:00install new electricity infrastructureCancelled
15404ST1531/10/2014 08:30 STRATHALBYN131/10/2014 11:30maintain/upgrade the local electricity networkScheduled
15341R1531/10/2014 08:30 ROBERTSTOWN131/10/2014 12:00improve the quality and/or reliability of the power supplyScheduled
15410VH3431/10/2014 08:30 WATTLE FLAT1031/10/2014 12:30maintain/upgrade the local electricity networkScheduled
15396SM350E31/10/2014 08:30 KINGSWOOD
 MITCHAM
 TORRENS PARK
20531/10/2014 15:00maintain/upgrade the local electricity networkScheduled
8358AP372D, EL02, EL04, SSD42231/10/2014 09:00 CROYDON
 CROYDON PARK
 KILKENNY
 WEST CROYDON
27531/10/2014 12:00install new electricity infrastructureScheduled
14667HH130A31/10/2014 09:00 HOLDEN HILL4031/10/2014 15:00maintain/upgrade the local electricity networkScheduled
14602CV29, CV3031/10/2014 09:00 KELLY
 KIMBA
 MOSELEY
 SOLOMON
4331/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15094ME347C31/10/2014 09:30 BROOKLYN PARK131/10/2014 12:30maintain/upgrade the local electricity networkScheduled
14931NU1331/10/2014 12:00 GREENOCK131/10/2014 15:00maintain/upgrade the local electricity networkScheduled
15741CN01, CN02, CN0301/11/2014 08:00 ASHVILLE
 COLEBATCH
 COORONG
 FIELD
 MENINGIE
 MENINGIE EAST
 MURRAY BRIDGE
 WALTOWA
 YUMALI
20401/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
8764AP227B01/11/2014 08:00 HENDON
 ROYAL PARK
14301/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15679R02, R11, R14, R16, SD36303, SSD19202/11/2014 07:30 BOWER
 BROWNLOW
 BUCHANAN
 EUDUNDA
 HAMPDEN
 HANSBOROUGH
 HILLIER
 JULIA
 MOUNT MARY
 NEALES FLAT
 NGAPALA
 PEEP HILL
 SUTHERLANDS
74202/11/2014 07:45maintain/upgrade the local electricity networkScheduled
9178AP149C02/11/2014 08:00 FULHAM
 FULHAM GARDENS
1902/11/2014 11:00maintain/upgrade the local electricity networkCancelled
4920HH496C, HH496D02/11/2014 08:00 MODBURY HEIGHTS
 WYNN VALE
30302/11/2014 14:00repair underground infrastructureScheduled
15838NU1102/11/2014 08:00 DUTTON102/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14530SM179D, SM402C, SSD179, SSD40202/11/2014 08:00 MELROSE PARK1202/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15735CN0202/11/2014 08:00 COLEBATCH
 COORONG
 FIELD
 MENINGIE
 MENINGIE EAST
 YUMALI
8702/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14604SM411C, SM411D, SSD41102/11/2014 08:00 BELAIR
 BLACKWOOD
 TORRENS PARK
69102/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15720SA19, SSD40702/11/2014 08:00 SALISBURY
 SALISBURY SOUTH
5902/11/2014 15:00install new electricity infrastructureScheduled
15348AP424B02/11/2014 08:00 SEATON8402/11/2014 15:00maintain/upgrade the local electricity networkScheduled
8378AP529C02/11/2014 08:00 LARGS BAY2002/11/2014 15:00maintain/upgrade the local electricity networkCancelled
14531MI16, SD4920102/11/2014 08:30 RENDELSHAM
 SOUTHEND
29302/11/2014 14:00maintain/upgrade the local electricity networkScheduled
15516BT12, BT15, BT20, BT22, BT32, NA1202/11/2014 11:05002/11/2014 11:00provide safe access to the electricity network for 5 to 15 minutesCancelled
14410SD44200, SSD159, SSD17102/11/2014 14:00 HAY FLAT102/11/2014 15:00install new electricity infrastructureScheduled
15813SM126A03/11/2014 08:00 BELAIR10703/11/2014 11:30maintain/upgrade the local electricity networkScheduled
15392NL210A, SSD21003/11/2014 08:00 FLAGSTAFF HILL10403/11/2014 13:00maintain/upgrade the local electricity networkScheduled
11088SM410C, SM410D, SSD41003/11/2014 08:00 GLENELG EAST
 GLENGOWRIE
28703/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15684AP529E03/11/2014 08:00 LARGS BAY1303/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15687AP529E03/11/2014 08:00 LARGS BAY1503/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14650HH177B03/11/2014 08:00 PARA HILLS7303/11/2014 15:00install new electricity infrastructureScheduled
13913HH130B, HH496C, SSD130, SSD49603/11/2014 08:00 MODBURY HEIGHTS
 MODBURY NORTH
2403/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14534KI4403/11/2014 08:00003/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15188SM216G03/11/2014 08:00 BRIGHTON1603/11/2014 15:00provide a safe working environment for customers to access equipmentScheduled
12355CN2103/11/2014 08:00 MENINGIE1003/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13725M2103/11/2014 08:00 WALL FLAT803/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15290NA0803/11/2014 08:00 JOANNA
 MOYHALL
 NARACOORTE
503/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14393AP226C, AP226D03/11/2014 08:30 ETHELTON9303/11/2014 14:00maintain/upgrade the local electricity networkScheduled
15216VH1503/11/2014 08:30 HAYBOROUGH
 PORT ELLIOT
 VICTOR HARBOR
403/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14996SM216B03/11/2014 08:30 SOMERTON PARK8503/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15136MV5204/11/2014 08:00 WILLUNGA304/11/2014 12:00maintain/upgrade the local electricity networkScheduled
15043AP529E04/11/2014 08:00 LARGS BAY2604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15554PL1404/11/2014 08:00 PORT LINCOLN
 TIATUKIA
204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15118AP529E04/11/2014 08:00 LARGS BAY2904/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14684HH145C, HH145D04/11/2014 08:00 RIDGEHAVEN4304/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15086KI3204/11/2014 08:00 KINGSCOTE1004/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14842AP227A04/11/2014 08:00 CHELTENHAM104/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15797SM179C04/11/2014 08:00 CLAPHAM
 LOWER MITCHAM
6704/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12923SM410C, SM410D04/11/2014 08:00 GLENELG EAST3804/11/2014 15:00install new electricity infrastructureScheduled
14888AP425B04/11/2014 08:00 FINDON
 FLINDERS PARK
4404/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15518YK2004/11/2014 08:30 KOOLYWURTIE104/11/2014 11:00improve the quality and/or reliability of the power supplyScheduled
14458KA2404/11/2014 08:30 BUMBUNGA
 CONDOWIE
 EVERARD CENTRAL
 NANTAWARRA
 SNOWTOWN
2504/11/2014 12:30maintain/upgrade the local electricity networkScheduled
12647KA2104/11/2014 08:30004/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15237SSD171, VH3404/11/2014 08:30 MYPONGA
 WATTLE FLAT
1704/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13022AP226C04/11/2014 08:30 ETHELTON6604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15573NL111Q04/11/2014 08:30 REYNELLA2604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15329CV2604/11/2014 09:00 COWELL204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13624PP0804/11/2014 09:00 PORT FLINDERS
 WARNERTOWN
 WEEROONA ISLAND
2904/11/2014 15:00install new electricity infrastructureScheduled
15236HH341E04/11/2014 09:30 EVANDALE
 MAYLANDS
104/11/2014 12:30maintain/upgrade the local electricity networkScheduled
4345MT16, MT2204/11/2014 10:00 BALGOWAN2504/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15703MV5304/11/2014 10:00 DINGABLEDINGA
 KUITPO
 WILLUNGA
1204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13764CBD367E, CBD367F04/11/2014 22:00005/11/2014 04:00maintain/upgrade the local electricity networkScheduled
14875HH177E, HH403B, SSD177, SSD40305/11/2014 08:00 INGLE FARM14505/11/2014 15:00install new electricity infrastructureScheduled
15353W2905/11/2014 08:00 COLLEY305/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15688AP529E05/11/2014 08:00 LARGS BAY
 SEMAPHORE
105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15380NL451C, SSD45105/11/2014 08:00 O'HALLORAN HILL6405/11/2014 15:00install new electricity infrastructureScheduled
15386SM126A05/11/2014 08:00 BELAIR
 GLENALTA
805/11/2014 15:00install new electricity infrastructureScheduled
8801NL2105/11/2014 08:00 CHANDLERS HILL805/11/2014 15:00install new electricity infrastructureCancelled
14970AP529E05/11/2014 08:00 LARGS BAY4105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14974NL111A05/11/2014 08:00 LONSDALE305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15067R05, R0705/11/2014 08:00 MANOORA
 SADDLEWORTH
 WATERLOO
2905/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12215MG1705/11/2014 08:00 PORT MACDONNELL1705/11/2014 15:00improve the quality and/or reliability of the power supplyCancelled
15620EL1105/11/2014 08:00 ONE TREE HILL105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15035ME231E05/11/2014 08:00 GLENELG NORTH305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14300VH7205/11/2014 08:00 DEEP CREEK805/11/2014 15:00maintain/upgrade the local electricity networkScheduled
11225MV13, MV15, MV51, SSD413, SSD52105/11/2014 08:00 WILLUNGA1405/11/2014 15:00improve the quality and/or reliability of the power supplyCancelled
15141SSD152, WK3105/11/2014 08:30 GOLDEN HEIGHTS
 WAIKERIE
305/11/2014 12:30improve the quality and/or reliability of the power supplyScheduled
13943G1305/11/2014 08:30 CALTOWIE205/11/2014 13:00maintain/upgrade the local electricity networkScheduled
14876M4405/11/2014 08:30 CAMBRAI
 KONGOLIA
1605/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15639AP351E, AP365C05/11/2014 08:30 CHELTENHAM7905/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14818HH102D05/11/2014 08:30 MEDINDIE
 NORTH ADELAIDE
7405/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15540SM216B05/11/2014 08:30 NORTH BRIGHTON
 SOMERTON PARK
1305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15268SM137B05/11/2014 09:30 STURT105/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15483GA25, SSD23005/11/2014 12:00 BIBARINGA
 EVANSTON PARK
 GAWLER SOUTH
705/11/2014 13:59maintain/upgrade the local electricity networkScheduled
15669SSD26605/11/2014 21:00005/11/2014 23:59maintain/upgrade the local electricity networkScheduled
15805AP372B06/11/2014 08:00 BEVERLEY1406/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14857KI5206/11/2014 08:00006/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13355SM216A, SM216B06/11/2014 08:00 SOMERTON PARK3206/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15507YK0506/11/2014 08:30 STANSBURY
 WOOL BAY
 YORKETOWN
4206/11/2014 08:35maintain/upgrade the local electricity networkScheduled
15300VH3406/11/2014 08:30006/11/2014 14:00improve the quality and/or reliability of the power supplyScheduled
15132MTB2106/11/2014 08:30 BALHANNAH
 HAHNDORF
1206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15753BT06, BT14, BT18, BT19, BT23, BT26, BT27, BT29, BT34, CN61, CN73, CN76, SD4510106/11/2014 11:01 BORDERTOWN
 BRIMBAGO
 BUNBURY
 CAREW
 COLEBATCH
 COOMBE
 COONALPYN
 CULBURRA
 DEEPWATER
 GERANIUM
 KEITH
 LAFFER
 MAKIN
 MCCALLUM
 MOUNT CHARLES
 NGARKAT
 PETHERICK
 SHAUGH
 SHERWOOD
 TILLEY SWAMP
 TINTINARA
 WILLALOOKA
 WIRREGA
166806/11/2014 11:00provide safe access to the electricity network for 5 to 15 minutesScheduled
15507YK0506/11/2014 14:55 STANSBURY
 WOOL BAY
 YORKETOWN
4206/11/2014 15:00maintain/upgrade the local electricity networkScheduled

About planned work

When we plan work on our electricity network in your area, we aim to provide you with a minimum of four business days' notice.  In most instances we will send a notification card via post, or hand delivered to your letterbox.  From time to time we notify our customers via local newspapers and/or radio advertising.

If you have received an 'Interruption to your power supply' notification card, the times advised on the card are a guide only and are intended to advise the maximum time that your power could be interrupted.  You should assume that you will not have power for the entire duration of the planned work, however the power may go off later than the time advised, may come back on earlier than the time advised, or in rare cases work may go over the anticipated timeframe.

Customers can register to receive an SMS confirmation when the power is restored after a planned outage. Please visit Power@MyPlace™ for more details.

There may be occasions when we cancel scheduled work.  This could be due to major weather events such as heatwaves, bushfires or storms when crews may be assisting in other areas to restore power supply, when crews have already worked the maximum hours allowed under safety regulations, or if working temperatures exceed safety guidelines.

 

Getting updates

We regret that we are not normally able to provide advance direct notification on the rare occasions we cancel work due to the short lead time and apologise for any inconvenience this may cause.  Where possible, we will use every endeavour to provide updates about planned interruption cancellations on this page.  In the event work is cancelled, we will provide you with follow-up written advice when the work is rescheduled.

You may check the SA Power Networks website on the morning of the date you have been notified your power will be interrupted to verify if the work will proceed as planned. Updates are made daily at 8am, and on Fridays for weekend work.

We recommend you place the notification card in a visible place, such as on your refrigerator, as a reminder of when you will not have power.  Please ensure other members of your household or business, or any electrical contractor who may be conducting work at your property, are also aware of the power outage.

 

Your feedback

We regularly seek feedback from customers to improve our service. Some have suggested that conducting planned work at night when most people are asleep would be more convenient. While some work may take place at night such as along major roads or if the power outage affects an entire substation area, normally in country areas, we are unable to do this in most cases as the lighting required to undertake our work safely, and the noise levels involved in the work, would be disruptive to residents.

 

Why does the power need to be off for so long?

Due to the time taken to safely prepare our network for maintenance, there is less disruption to customers in having the power interrupted in one long period to do multiple jobs, rather than spread across multiple days. On rare occasions major projects will require multiple power outages and we notify affected customers in these situations.

 

Things to remember during a planned power outage:

  • No power means no internet and email unless you have wireless service.
  • Some phones, particularly cordless ones, may not operate.
  • Many electric garage doors and gates can be operated manually. Please check before the date of your power outage or refer to the instruction manual. If there is no manual override mechanism, you may wish to either leave the door or gate open before the power goes out, or leave items you will need to access, such as your car, outside the garage or property before the power goes out.
  • Most security systems will have back up batteries and will not be affected by a power interruption, although this will depend on factors such as the condition of the batteries. Please refer to the manual or with the installer or manufacturer to check how long the battery will provide temporary power to your security system.
  • A refrigerator will keep food cold longer if you do not open the door. Resist the temptation to open it to check the contents. This particularly applies to your freezer.
  • If the weather is hot, consider the option of visiting relatives or friends who have power, or go to a public place with air conditioning such as a library, community centre or shopping centre. Check that electrical appliances such as stoves and heaters are switched off as there is a risk of fire when power supply is restored if these are left unattended.
  • Make sure that all taps are turned off if you use an electric pressure pump. This will prevent flooding if power is restored when you are not home.
  • If water supply is from tanks or a bore, then alternatives to the normal electric pressure pump should be considered.
  • Remember continuous use of water from an electric hot water system will result in cold water. Consider this if you anticipate a long wait before power is restored.
  • Most customers with Photovoltaic (PV) solar array systems will also experience a power outage and will not be able to use their own generated power, or export energy back into our network for safety reasons. You may like to check with your electrician or solar installer to identify if your system will still operate when mains power is not available.
  • Customers using life support medical equipment are also affected by power outages, both planned and unplanned. Refer to your emergency action plan, or create one if you haven't already done so. Contact your medical practitioner for advice if necessary. Life support fact sheets are available at www.sapowernetworks.com.au

Please note that if we are taking action to prevent or rectify an emergency or unplanned power outage we are not able to notify you in advance of an interruption to your power supply.

You are welcome to contact us on 13 12 61 if you have any queries about a planned power outage.