Planned interruptions

SA Power Networks is committed to providing a safe and reliable electricity supply for South Australians.  To do this, there are times when we need to interrupt your power supply - usually for upgrades of the electricity network to meet future demand; to ensure the quality of supply (within Australian voltage standards); to connect new customers; or for planned maintenance of the network, which minimises the risk of unplanned outages.

We make every effort to ensure information on upcoming planned work is accurate at the time published.

If you are checking for today's planned work, you will find the status to be blank.  For work today where the power has already been interrupted, please check our current power interruptions page or contact our 24 hour faults and emergencies number 13 13 66.

For upcoming work, please note that the times provided on written notifications and below are the maximum anticipated outage times. Power may be turned off later than advised, and be restored either earlier than advised or, in rare cases, later than advised if there has been a complication.

Please note, planned work may not proceed in extreme weather or due to unforeseen circumstances.

We recommend that you plan for the outage to last the entire estimated duration and register with Power@MyPlace™ for SMS updates on outages affecting your property.

Future Planned Power Interruptions

JobFeedersApproximate Start TimeAreas AffectedEstimated Number of Customers AffectedApproximate Restoration TimeReasonStatus
8764AP227B01/11/2014 08:00 HENDON
 ROYAL PARK
14301/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15741CN01, CN02, CN0301/11/2014 08:00 ASHVILLE
 COLEBATCH
 COORONG
 FIELD
 MENINGIE
 MENINGIE EAST
 MURRAY BRIDGE
 WALTOWA
 YUMALI
20401/11/2014 15:00improve the quality and/or reliability of the power supply
15679R02, R11, R14, R16, SD36303, SSD19202/11/2014 07:30 BOWER
 BROWNLOW
 BUCHANAN
 EUDUNDA
 HAMPDEN
 HANSBOROUGH
 HILLIER
 JULIA
 MOUNT MARY
 NEALES FLAT
 NGAPALA
 PEEP HILL
 SUTHERLANDS
74102/11/2014 07:45maintain/upgrade the local electricity networkScheduled
9178AP149C02/11/2014 08:00 FULHAM
 FULHAM GARDENS
1902/11/2014 11:00maintain/upgrade the local electricity networkCancelled
4920HH496C, HH496D02/11/2014 08:00 MODBURY HEIGHTS
 WYNN VALE
30302/11/2014 14:00repair underground infrastructureScheduled
14530SM179D, SM402C, SSD179, SSD40202/11/2014 08:00 MELROSE PARK1202/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14604SM411C, SM411D, SSD41102/11/2014 08:00 BELAIR
 BLACKWOOD
 TORRENS PARK
69102/11/2014 15:00maintain/upgrade the local electricity networkCancelled
14908NU3502/11/2014 08:00 STEINFELD202/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15720SA19, SSD40702/11/2014 08:00 SALISBURY
 SALISBURY SOUTH
5902/11/2014 15:00install new electricity infrastructureScheduled
15838NU1102/11/2014 08:00 DUTTON102/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15962AP146E02/11/2014 08:00 KILKENNY2402/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15735CN0202/11/2014 08:00 COLEBATCH
 COORONG
 FIELD
 MENINGIE
 MENINGIE EAST
 YUMALI
8702/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15866BU0802/11/2014 08:00 BURRA
 COLLINSVILLE
 HALLETT
 MOUNT BRYAN EAST
 PINE CREEK
 WONNA
3202/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15348AP424B02/11/2014 08:00 SEATON8402/11/2014 15:00maintain/upgrade the local electricity networkScheduled
8378AP529C02/11/2014 08:00 LARGS BAY2002/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15868MI16, SD4920102/11/2014 08:30 RENDELSHAM
 SOUTHEND
28702/11/2014 14:00maintain/upgrade the local electricity networkScheduled
15928SM216B02/11/2014 08:30 SOMERTON PARK1702/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15593HH177C02/11/2014 08:30 INGLE FARM11202/11/2014 15:00install new electricity infrastructureScheduled
15922SM349F02/11/2014 08:30 HALLETT COVE1102/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15516BT12, BT15, BT20, BT22, BT32, NA1202/11/2014 11:05002/11/2014 11:00provide safe access to the electricity network for 5 to 15 minutesCancelled
14410SD44200, SSD159, SSD17102/11/2014 14:00 HAY FLAT102/11/2014 15:00install new electricity infrastructureScheduled
15813SM126A03/11/2014 08:00 BELAIR10703/11/2014 11:30maintain/upgrade the local electricity networkScheduled
15392NL210A, SSD21003/11/2014 08:00 FLAGSTAFF HILL10403/11/2014 13:00maintain/upgrade the local electricity networkScheduled
13913HH130B, HH496C, SSD130, SSD49603/11/2014 08:00 MODBURY HEIGHTS
 MODBURY NORTH
2403/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15684AP529E03/11/2014 08:00 LARGS BAY1303/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14534KI4403/11/2014 08:00003/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13725M2103/11/2014 08:00 WALL FLAT803/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14650HH177B03/11/2014 08:00 PARA HILLS7303/11/2014 15:00install new electricity infrastructureScheduled
15687AP529E03/11/2014 08:00 LARGS BAY1503/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15873SD33201, SD33202, SD33203, SD3320403/11/2014 08:00 BLYTH
 KYBUNGA
1303/11/2014 15:00install new electricity infrastructureScheduled
15915SD3910103/11/2014 08:00 MANNUM203/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15290NA0803/11/2014 08:00 JOANNA
 MOYHALL
 NARACOORTE
503/11/2014 15:00improve the quality and/or reliability of the power supplyCancelled
15953SG0403/11/2014 08:00 BASKET RANGE1503/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15961NA0503/11/2014 08:00003/11/2014 15:00maintain/upgrade the local electricity networkScheduled
11088SM410C, SM410D, SSD41003/11/2014 08:00 GLENELG EAST
 GLENGOWRIE
28703/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12355CN2103/11/2014 08:00 MENINGIE1003/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15188SM216G03/11/2014 08:00 BRIGHTON1603/11/2014 15:00provide a safe working environment for customers to access equipmentScheduled
15889HH121C, SSD12103/11/2014 08:00 PARADISE1603/11/2014 15:30repair underground infrastructureScheduled
14393AP226C, AP226D03/11/2014 08:30 ETHELTON9303/11/2014 14:00maintain/upgrade the local electricity networkScheduled
14996SM216B03/11/2014 08:30 SOMERTON PARK8503/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15216VH1503/11/2014 08:30 HAYBOROUGH
 PORT ELLIOT
 VICTOR HARBOR
403/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15136MV5204/11/2014 08:00 WILLUNGA304/11/2014 12:00maintain/upgrade the local electricity networkScheduled
15554PL1404/11/2014 08:00 PORT LINCOLN
 TIATUKIA
204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14888AP425B04/11/2014 08:00 FINDON
 FLINDERS PARK
4404/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15797SM179C04/11/2014 08:00 CLAPHAM
 LOWER MITCHAM
6704/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14842AP227A04/11/2014 08:00 CHELTENHAM104/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14684HH145C, HH145D04/11/2014 08:00 RIDGEHAVEN4304/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15043AP529E04/11/2014 08:00 LARGS BAY2604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15086KI3204/11/2014 08:00 KINGSCOTE1004/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15118AP529E04/11/2014 08:00 LARGS BAY2904/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15968MI14, SSD27404/11/2014 08:00 BEACHPORT1204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12923SM410C, SM410D04/11/2014 08:00 GLENELG EAST3804/11/2014 15:00install new electricity infrastructureScheduled
15518YK2004/11/2014 08:30 KOOLYWURTIE104/11/2014 11:00improve the quality and/or reliability of the power supplyScheduled
14458KA2404/11/2014 08:30 BUMBUNGA
 CONDOWIE
 EVERARD CENTRAL
 NANTAWARRA
 SNOWTOWN
2504/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15237SSD171, VH3404/11/2014 08:30 MYPONGA
 WATTLE FLAT
1704/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15573NL111Q04/11/2014 08:30 REYNELLA2604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12647KA2104/11/2014 08:30004/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13022AP226C04/11/2014 08:30 ETHELTON6604/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13624PP0804/11/2014 09:00 PORT FLINDERS
 WARNERTOWN
 WEEROONA ISLAND
2904/11/2014 15:00install new electricity infrastructureScheduled
15329CV2604/11/2014 09:00 COWELL204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15236HH341E04/11/2014 09:30 EVANDALE
 MAYLANDS
104/11/2014 12:30maintain/upgrade the local electricity networkScheduled
4345MT16, MT2204/11/2014 10:00 BALGOWAN2504/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15703MV5304/11/2014 10:00 DINGABLEDINGA
 KUITPO
 WILLUNGA
1204/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13764CBD367E, CBD367F04/11/2014 22:00005/11/2014 04:00maintain/upgrade the local electricity networkScheduled
8801NL2105/11/2014 08:00 CHANDLERS HILL805/11/2014 15:00install new electricity infrastructureCancelled
15353W2905/11/2014 08:00 COLLEY305/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
11225MV13, MV15, MV51, SSD413, SSD52105/11/2014 08:00 WILLUNGA1405/11/2014 15:00improve the quality and/or reliability of the power supplyCancelled
12215MG1705/11/2014 08:00 PORT MACDONNELL1705/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14300VH7205/11/2014 08:00 DEEP CREEK805/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15380NL451C, SSD45105/11/2014 08:00 O'HALLORAN HILL6405/11/2014 15:00install new electricity infrastructureScheduled
15909NA1205/11/2014 08:00 LOCHABER105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15084HH432B, HH432F, SSD43205/11/2014 08:00 COLLINSWOOD
 ENFIELD
 NAILSWORTH
 PROSPECT
23205/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15386SM126A05/11/2014 08:00 BELAIR
 GLENALTA
805/11/2014 15:00install new electricity infrastructureScheduled
15035ME231E05/11/2014 08:00 GLENELG NORTH305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14974NL111A05/11/2014 08:00 LONSDALE305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14970AP529E05/11/2014 08:00 LARGS BAY4105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15620EL1105/11/2014 08:00 ONE TREE HILL105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14727KI5405/11/2014 08:00 KARATTA
 PARNDANA
 VIVONNE BAY
1805/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15688AP529E05/11/2014 08:00 LARGS BAY
 SEMAPHORE
105/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15926M4405/11/2014 08:00 CAMBRAI105/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14875HH177E, HH403B, SSD177, SSD40305/11/2014 08:00 INGLE FARM14505/11/2014 15:00install new electricity infrastructureScheduled
15141SSD152, WK3105/11/2014 08:30 GOLDEN HEIGHTS
 WAIKERIE
305/11/2014 12:30improve the quality and/or reliability of the power supplyScheduled
15540SM216B05/11/2014 08:30 NORTH BRIGHTON
 SOMERTON PARK
1305/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14818HH102D05/11/2014 08:30 MEDINDIE
 NORTH ADELAIDE
7405/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15639AP351E, AP365C05/11/2014 08:30 CHELTENHAM7905/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15268SM137B05/11/2014 09:30 STURT105/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15483GA25, SSD23005/11/2014 12:00 BIBARINGA
 EVANSTON PARK
 GAWLER SOUTH
705/11/2014 13:59maintain/upgrade the local electricity networkScheduled
15669SSD26605/11/2014 21:00005/11/2014 23:59maintain/upgrade the local electricity networkScheduled
15668W03, W07, W24, W25, W26, W30, W3306/11/2014 00:30 BOONERDO
 LOCK
 MURDINGA
 MURLONG
 PALKAGEE
 TOOLIGIE
 ULYERRA
45906/11/2014 04:00maintain/upgrade the local electricity networkScheduled
15903AP149F, SSD14906/11/2014 06:00 HENLEY BEACH106/11/2014 09:00maintain/upgrade the local electricity networkScheduled
15930BM1506/11/2014 08:00 COBDOGLA
 OVERLAND CORNER
1206/11/2014 14:30maintain/upgrade the local electricity networkScheduled
13355SM216A, SM216B06/11/2014 08:00 SOMERTON PARK3206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15272AP529E06/11/2014 08:00 LARGS BAY206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15767VH7206/11/2014 08:00 DEEP CREEK806/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15836HH145A06/11/2014 08:00 FAIRVIEW PARK4506/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15238NL21, SSD12006/11/2014 08:00 CLARENDON
 ONKAPARINGA HILLS
2706/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15690AP529E06/11/2014 08:00 BIRKENHEAD
 PETERHEAD
206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15026KA2206/11/2014 08:00 PORT BROUGHTON4206/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15857MI1306/11/2014 08:00 ROBE206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15402SM126A, SM126B06/11/2014 08:00 GLENALTA16406/11/2014 15:00install new electricity infrastructureScheduled
15691AP529E06/11/2014 08:00 LARGS BAY206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15805AP372B06/11/2014 08:00 BEVERLEY1406/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14857KI5206/11/2014 08:00006/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15929BM1506/11/2014 08:00 COBDOGLA
 OVERLAND CORNER
1206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15015AP529E06/11/2014 08:00 SEMAPHORE7606/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15507YK0506/11/2014 08:30 STANSBURY
 WOOL BAY
 YORKETOWN
4206/11/2014 08:35maintain/upgrade the local electricity networkScheduled
15300VH3406/11/2014 08:30006/11/2014 14:00improve the quality and/or reliability of the power supplyScheduled
12503AP226C06/11/2014 08:30 ETHELTON2406/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15848MI0106/11/2014 08:30 MILLICENT606/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15132MTB2106/11/2014 08:30 BALHANNAH
 HAHNDORF
1206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13923GU41, SSD17806/11/2014 08:30 GUMERACHA506/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15890MV4106/11/2014 08:30 MOUNT COMPASS306/11/2014 15:00install new electricity infrastructureScheduled
14726SM349F06/11/2014 08:30 MARINO1106/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14615SM216A, SM216B06/11/2014 08:30 SOMERTON PARK7306/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15350SM350D06/11/2014 09:30 NETHERBY106/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15352HH121F06/11/2014 09:30 CAMPBELLTOWN
 PARADISE
106/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15608CN7606/11/2014 09:30 TINTINARA206/11/2014 14:00maintain/upgrade the local electricity networkScheduled
13818KA04, KA2406/11/2014 10:31 NORTH MOONTA
 WARBURTO
1006/11/2014 14:30maintain/upgrade the local electricity networkScheduled
15753BT06, BT14, BT18, BT19, BT23, BT26, BT27, BT29, BT34, CN61, CN73, CN76, SD4510106/11/2014 11:01 BORDERTOWN
 BRIMBAGO
 BUNBURY
 CAREW
 COLEBATCH
 COOMBE
 COONALPYN
 CULBURRA
 DEEPWATER
 GERANIUM
 KEITH
 LAFFER
 MAKIN
 MCCALLUM
 MOUNT CHARLES
 NGARKAT
 PETHERICK
 SHAUGH
 SHERWOOD
 TILLEY SWAMP
 TINTINARA
 WILLALOOKA
 WIRREGA
166606/11/2014 11:00provide safe access to the electricity network for 5 to 15 minutesScheduled
15507YK0506/11/2014 14:55 STANSBURY
 WOOL BAY
 YORKETOWN
4206/11/2014 15:00maintain/upgrade the local electricity networkScheduled
5142HH177A, HH177F, SSD17706/11/2014 22:00 INGLE FARM
 POORAKA
10907/11/2014 06:00repair underground infrastructureScheduled
15671BM4407/11/2014 08:00 GLOSSOP207/11/2014 12:00install new electricity infrastructureScheduled
15419SM126A, SM411D, SSD126, SSD41107/11/2014 08:00 BELAIR
 BLACKWOOD
19607/11/2014 15:00install new electricity infrastructureScheduled
15499HH121C07/11/2014 08:00 ATHELSTONE6707/11/2014 15:00repair underground infrastructureScheduled
15296NU3107/11/2014 08:00 BETHANY107/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15561SB2307/11/2014 08:00 CARAWA
 HASLAM
907/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15163M9307/11/2014 08:00 ETTRICK107/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15107NU31, SSD53707/11/2014 08:00007/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15060SD3830007/11/2014 08:00 KERSBROOK1507/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14981HH107C, SSD10707/11/2014 08:00 ENFIELD6707/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15924HH428A07/11/2014 08:00 HILLCREST9107/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15638HH130D07/11/2014 08:00 MODBURY NORTH1407/11/2014 15:00repair underground infrastructureScheduled
15927HH428A07/11/2014 08:00 HILLCREST9107/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13370NL234C07/11/2014 08:00 PORT NOARLUNGA SOUTH1407/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13309HH386B, SSD38607/11/2014 08:00 HAZELWOOD PARK2707/11/2014 15:00install new electricity infrastructureScheduled
15729HH409A, SSD40907/11/2014 08:00 HORSNELL GULLY
 NORTON SUMMIT
 TERINGIE
2507/11/2014 15:00maintain regulated vegetation clearance around powerlinesScheduled
15952MTB61, SSD24707/11/2014 08:00 BRUKUNGA
 DAWESLEY
 NAIRNE
 PETWOOD
8007/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12075AP125D, AP529C, SSD125, SSD52907/11/2014 08:00 LARGS NORTH4007/11/2014 15:00maintain/upgrade the local electricity networkScheduled
11179NL111A, NL451E, SSD111, SSD45107/11/2014 08:00 HALLETT COVE6707/11/2014 15:00maintain/upgrade the local electricity networkScheduled
8816AP227A07/11/2014 08:00 QUEENSTOWN907/11/2014 15:00install new electricity infrastructureCancelled
15424MV4107/11/2014 08:30 TOOPERANG707/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15731GA745A, SSD74507/11/2014 08:30 HEWETT17307/11/2014 15:00install new electricity infrastructureScheduled
15157MB0307/11/2014 08:30 MOORLANDS
 NATURI
 SHERLOCK
 TAILEM BEND
 WYNARKA
3307/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15795YK1707/11/2014 09:00007/11/2014 11:00maintain/upgrade the local electricity networkScheduled
15863W0407/11/2014 09:00007/11/2014 12:00improve the quality and/or reliability of the power supplyScheduled
15463W2007/11/2014 11:00 KARCULTABY107/11/2014 13:00improve the quality and/or reliability of the power supplyScheduled
15876MTB5407/11/2014 11:00 FOREST RANGE107/11/2014 15:30maintain/upgrade the local electricity networkScheduled
15493MV41, ST36, ST5107/11/2014 12:00 ASHBOURNE
 MOUNT OBSERVATION
 TOOPERANG
2607/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15796YK1707/11/2014 12:00007/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14169NL111C, SSD11108/11/2014 07:00 O'SULLIVAN BEACH108/11/2014 15:30maintain/upgrade the local electricity networkScheduled
15799CN2508/11/2014 08:00 COORONG208/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15801CN3308/11/2014 08:00 NARRUNG408/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15807CN2208/11/2014 08:00 MENINGIE208/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13277NL111A, SM349F, SSD111, SSD34908/11/2014 08:30 KINGSTON PARK
 MARINO
 SEACLIFF
15108/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15172NL451A, NL451C, SM349D, SSD349, SSD45109/11/2014 08:00 SHEIDOW PARK
 TROTT PARK
9609/11/2014 11:30repair underground infrastructureScheduled
10169AP529D, SSD52909/11/2014 08:00 BIRKENHEAD
 NEW PORT
12409/11/2014 15:00maintain/upgrade the local electricity networkScheduled
10174EL02, EL03, EL04, SSD42209/11/2014 08:00 ELIZABETH WEST2509/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14870HH121F09/11/2014 08:00 PARADISE7909/11/2014 15:00install new electricity infrastructureScheduled
15988ME200A, SSD20009/11/2014 08:00 KESWICK109/11/2014 15:00install new electricity infrastructureScheduled
13126AP373D, SSD37309/11/2014 08:30 WINGFIELD709/11/2014 15:00install new electricity infrastructureScheduled
15164SA1409/11/2014 08:30 SALISBURY
 SALISBURY HEIGHTS
8209/11/2014 15:00install new electricity infrastructureScheduled
15847CN7709/11/2014 09:00 BUNBURY
 DEEPWATER
 MENINGIE
 SALT CREEK
 TINTINARA
6709/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15102NL451A, NL451B, SSD45109/11/2014 11:31 HALLETT COVE9309/11/2014 13:00repair underground infrastructureScheduled
15753BT06, BT14, BT18, BT19, BT23, BT26, BT27, BT29, BT34, CN61, CN73, CN76, SD4510109/11/2014 14:45009/11/2014 15:00provide safe access to the electricity network for 5 to 15 minutesScheduled
15834SM374A, SM374B, SM374C, SM374D, SM374E10/11/2014 03:31 BLACK FOREST
 CLARENCE GARDENS
 CLARENCE PARK
 CUMBERLAND PARK
 EDWARDSTOWN
 FORESTVILLE
 GLANDORE
 GOODWOOD
 KINGS PARK
 MELROSE PARK
 MILLSWOOD
 PLYMPTON
 SOUTH PLYMPTON
634410/11/2014 10:00install new electricity infrastructureScheduled
13413SG07, SSD24110/11/2014 08:00 ASHTON1410/11/2014 09:00maintain/upgrade the local electricity networkScheduled
15531EL1210/11/2014 08:00010/11/2014 12:00maintain/upgrade the local electricity networkScheduled
15808SM126A, SSD12610/11/2014 08:00 BELAIR7510/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15474WK4310/11/2014 08:00010/11/2014 13:00maintain/upgrade the local electricity networkScheduled
15947EL01A, SSD41410/11/2014 08:00 ELIZABETH GROVE810/11/2014 15:00install new electricity infrastructureScheduled
15942MTB5410/11/2014 08:00 OAKBANK1810/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14367HH177B, HH177C, HH177D10/11/2014 08:00 INGLE FARM
 PARA HILLS
15710/11/2014 15:00install new electricity infrastructureScheduled
14463GA0910/11/2014 08:00 LYNDOCH510/11/2014 15:00install new electricity infrastructureScheduled
14782M4310/11/2014 08:00 SEDAN210/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15627AP529E10/11/2014 08:00 SEMAPHORE2810/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15624EL1110/11/2014 08:00 YATTALUNGA210/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15752MTB8110/11/2014 08:00 CALLINGTON
 SALEM
310/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15913M7110/11/2014 08:00 NILDOTTIE910/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15908GA2210/11/2014 08:00 EVANSTON14010/11/2014 15:00install new electricity infrastructureScheduled
15568BT1410/11/2014 08:00010/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15562EL15, SSD27310/11/2014 08:00 VIRGINIA110/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15280AP529E10/11/2014 08:00 LARGS BAY2810/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15559KA0510/11/2014 08:00 KADINA
 WALLAROO MINES
910/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15555HH145D10/11/2014 08:00 ST AGNES1710/11/2014 15:00repair underground infrastructureScheduled
15534MTB41, SSD71910/11/2014 08:30 BALHANNAH
 VERDUN
4210/11/2014 14:00maintain/upgrade the local electricity networkCancelled
15840HH432F10/11/2014 08:30 PROSPECT3910/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12936NL111P10/11/2014 08:30 MORPHETT VALE2510/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14871VH1010/11/2014 08:30 VICTOR HARBOR1810/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14878MB4310/11/2014 08:30 BORRIKA
 SANDALWOOD
4110/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15365SM350A10/11/2014 09:30 MALVERN110/11/2014 12:30maintain/upgrade the local electricity networkScheduled
13413SG07, SSD24110/11/2014 10:00010/11/2014 13:00maintain/upgrade the local electricity networkScheduled
15683MTB1310/11/2014 10:30010/11/2014 12:30install new electricity infrastructureScheduled
15538EL1210/11/2014 12:30 HUMBUG SCRUB210/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13413SG07, SSD24110/11/2014 13:00010/11/2014 14:00maintain/upgrade the local electricity networkScheduled
15503GA0511/11/2014 08:00 BAROSSA GOLDFIELDS
 COCKATOO VALLEY
 LYNDOCH
 SANDY CREEK
 WILLIAMSTOWN
24711/11/2014 12:00improve the quality and/or reliability of the power supplyScheduled
13810PP03, PP0411/11/2014 08:00 PIRIE EAST
 PORT PIRIE
 RISDON PARK SOUTH
4611/11/2014 13:00maintain/upgrade the local electricity networkScheduled
15951MI1111/11/2014 08:00011/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15850HH145D11/11/2014 08:00 TEA TREE GULLY911/11/2014 15:00repair underground infrastructureScheduled
15883HH177A11/11/2014 08:00 INGLE FARM1311/11/2014 15:00repair underground infrastructureScheduled
15784NU15, NU25, SSD294, SSD68111/11/2014 08:00 EBENEZER
 NURIOOTPA
911/11/2014 15:00maintain/upgrade the local electricity networkScheduled
10935MV22, SSD12011/11/2014 08:00 KANGARILLA
 MEADOWS
21211/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13132SG04, SG07, SSD24111/11/2014 08:00 URAIDLA1811/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13189SM216B, SM410B, SM410C, SM410D, SSD216, SSD41011/11/2014 08:00 GLENELG EAST
 GLENGOWRIE
57311/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13262NL234A, NL511A, SSD234, SSD51111/11/2014 08:00 PORT NOARLUNGA
 PORT NOARLUNGA SOUTH
1011/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14859KI4311/11/2014 08:00 AMERICAN RIVER
 D'ESTREES BAY
 HAINES
 MACGILLIVRAY
3211/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15090W02, W1511/11/2014 08:00 MOUNT DAMPER
 PYGERY
 WUDINNA
5911/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15255EL1011/11/2014 08:00 ELIZABETH PARK10911/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15373AP226E11/11/2014 08:00 SEMAPHORE
 SEMAPHORE PARK
 SEMAPHORE SOUTH
2711/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15441SM126B, SM126C11/11/2014 08:00 HAWTHORNDENE11111/11/2014 15:00install new electricity infrastructureScheduled
15509HH177F, SSD17711/11/2014 08:00 POORAKA5911/11/2014 15:00repair underground infrastructureScheduled
15601R0111/11/2014 08:00 MANOORA211/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15344SSD340, VH2211/11/2014 08:30 GOOLWA12211/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15584KA2911/11/2014 08:30 ALFORD311/11/2014 13:30maintain/upgrade the local electricity networkScheduled
14922MV5111/11/2014 08:30 MCLAREN VALE
 WILLUNGA
5211/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14938SM216B11/11/2014 08:30 SOMERTON PARK5011/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15327GA1211/11/2014 08:30 LEWISTON
 TWO WELLS
6111/11/2014 15:00install new electricity infrastructureScheduled
15333HH386B11/11/2014 08:30 HAZELWOOD PARK
 TUSMORE
2511/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15592G3611/11/2014 09:00 COOMOOROO111/11/2014 12:00improve the quality and/or reliability of the power supplyScheduled
13144MG16, MG25, MG34, SSD321, SSD71311/11/2014 09:00 GERMAN CREEK
 KONGORONG
3711/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15407CD0311/11/2014 09:00011/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15748LM6211/11/2014 10:00011/11/2014 12:00improve the quality and/or reliability of the power supplyScheduled
15750LM6211/11/2014 12:30 PINNAROO111/11/2014 14:00improve the quality and/or reliability of the power supplyScheduled
14319G3611/11/2014 13:00 MOOCKRA111/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15821KA0811/11/2014 14:00 WILLAMULKA211/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
15131PA1512/11/2014 08:00 QUORN112/11/2014 12:00maintain/upgrade the local electricity networkScheduled
15791MV5312/11/2014 08:00 MOUNT COMPASS
 PAGES FLAT
 WILLUNGA
1112/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15633NU1512/11/2014 08:00 STOCKWELL7912/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15411AP529E12/11/2014 08:00 LARGS BAY212/11/2014 15:00maintain/upgrade the local electricity networkScheduled
12847PL0712/11/2014 08:00 PORT LINCOLN412/11/2014 15:00repair underground infrastructureScheduled
15792BT2212/11/2014 08:00012/11/2014 15:00install new electricity infrastructureScheduled
15904AP529E12/11/2014 08:00 EXETER812/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15565MV53, SSD41312/11/2014 08:00 DINGABLEDINGA
 MONTARRA
 WILLUNGA
1012/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15623AP529D, AP529E12/11/2014 08:00 LARGS BAY812/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13190SSD154, SSD368, VH13, VH15, VH4312/11/2014 08:00 HINDMARSH VALLEY
 PORT ELLIOT
1612/11/2014 15:00maintain/upgrade the local electricity networkScheduled
14939HH409E12/11/2014 08:00 KENSINGTON GARDENS
 KENSINGTON PARK
312/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15471SM126B12/11/2014 08:00 GLENALTA
 HAWTHORNDENE
6412/11/2014 15:00install new electricity infrastructureScheduled
15846AP529E12/11/2014 08:00 LARGS BAY212/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15948HH130D, HH145B, HH145E, SSD130, SSD14512/11/2014 08:00 REDWOOD PARK41312/11/2014 15:00repair underground infrastructureScheduled
15479MB3112/11/2014 08:00 MYPOLONGA
 WOODLANE
2312/11/2014 15:00install new electricity infrastructureScheduled
13421MTB3212/11/2014 08:00 KANGARILLA2512/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15252KA2112/11/2014 08:30 THOMAS PLAIN112/11/2014 11:00maintain/upgrade the local electricity networkScheduled
13640KI5412/11/2014 08:30 PARNDANA
 VIVONNE BAY
912/11/2014 13:00maintain/upgrade the local electricity networkScheduled
15945VH2112/11/2014 08:30 GOOLWA SOUTH212/11/2014 15:00maintain/upgrade the local electricity networkScheduled
13479MI0712/11/2014 08:30 CLAY WELLS
 CONMURRA
 FOX
 FURNER
 GREENWAYS
 KANGAROO INN
7612/11/2014 15:00install new electricity infrastructureScheduled
14373SM350B12/11/2014 08:30 FULLARTON
 HIGHGATE
 MALVERN
6612/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15430SM350D, SM350E12/11/2014 08:30 NETHERBY3312/11/2014 15:00improve the quality and/or reliability of the power supplyScheduled
14957CV1612/11/2014 09:00012/11/2014 15:00install new electricity infrastructureCancelled
15563ME347C12/11/2014 09:30 LOCKLEYS112/11/2014 12:30maintain/upgrade the local electricity networkScheduled
15567SM350A12/11/2014 09:30 MALVERN112/11/2014 12:30maintain/upgrade the local electricity networkScheduled
13383NL234C12/11/2014 11:00 SEAFORD2612/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15251KA2112/11/2014 11:01 THOMAS PLAIN112/11/2014 15:00maintain/upgrade the local electricity networkScheduled
15133PA1512/11/2014 12:30 QUORN112/11/2014 15:00maintain/upgrade the local electricity networkCancelled
15621EL1112/11/2014 12:30 ONE TREE HILL212/11/2014 15:00maintain/upgrade the local electricity networkScheduled

About planned work

When we plan work on our electricity network in your area, we aim to provide you with a minimum of four business days' notice.  In most instances we will send a notification card via post, or hand delivered to your letterbox.  From time to time we notify our customers via local newspapers and/or radio advertising.

If you have received an 'Interruption to your power supply' notification card, the times advised on the card are a guide only and are intended to advise the maximum time that your power could be interrupted.  You should assume that you will not have power for the entire duration of the planned work, however the power may go off later than the time advised, may come back on earlier than the time advised, or in rare cases work may go over the anticipated timeframe.

Customers can register to receive an SMS confirmation when the power is restored after a planned outage. Please visit Power@MyPlace™ for more details.

There may be occasions when we cancel scheduled work.  This could be due to major weather events such as heatwaves, bushfires or storms when crews may be assisting in other areas to restore power supply, when crews have already worked the maximum hours allowed under safety regulations, or if working temperatures exceed safety guidelines.

 

Getting updates

We regret that we are not normally able to provide advance direct notification on the rare occasions we cancel work due to the short lead time and apologise for any inconvenience this may cause.  Where possible, we will use every endeavour to provide updates about planned interruption cancellations on this page.  In the event work is cancelled, we will provide you with follow-up written advice when the work is rescheduled.

You may check the SA Power Networks website on the morning of the date you have been notified your power will be interrupted to verify if the work will proceed as planned. Updates are made daily at 8am, and on Fridays for weekend work.

We recommend you place the notification card in a visible place, such as on your refrigerator, as a reminder of when you will not have power.  Please ensure other members of your household or business, or any electrical contractor who may be conducting work at your property, are also aware of the power outage.

 

Your feedback

We regularly seek feedback from customers to improve our service. Some have suggested that conducting planned work at night when most people are asleep would be more convenient. While some work may take place at night such as along major roads or if the power outage affects an entire substation area, normally in country areas, we are unable to do this in most cases as the lighting required to undertake our work safely, and the noise levels involved in the work, would be disruptive to residents.

 

Why does the power need to be off for so long?

Due to the time taken to safely prepare our network for maintenance, there is less disruption to customers in having the power interrupted in one long period to do multiple jobs, rather than spread across multiple days. On rare occasions major projects will require multiple power outages and we notify affected customers in these situations.

 

Things to remember during a planned power outage:

  • No power means no internet and email unless you have wireless service.
  • Some phones, particularly cordless ones, may not operate.
  • Many electric garage doors and gates can be operated manually. Please check before the date of your power outage or refer to the instruction manual. If there is no manual override mechanism, you may wish to either leave the door or gate open before the power goes out, or leave items you will need to access, such as your car, outside the garage or property before the power goes out.
  • Most security systems will have back up batteries and will not be affected by a power interruption, although this will depend on factors such as the condition of the batteries. Please refer to the manual or with the installer or manufacturer to check how long the battery will provide temporary power to your security system.
  • A refrigerator will keep food cold longer if you do not open the door. Resist the temptation to open it to check the contents. This particularly applies to your freezer.
  • If the weather is hot, consider the option of visiting relatives or friends who have power, or go to a public place with air conditioning such as a library, community centre or shopping centre. Check that electrical appliances such as stoves and heaters are switched off as there is a risk of fire when power supply is restored if these are left unattended.
  • Make sure that all taps are turned off if you use an electric pressure pump. This will prevent flooding if power is restored when you are not home.
  • If water supply is from tanks or a bore, then alternatives to the normal electric pressure pump should be considered.
  • Remember continuous use of water from an electric hot water system will result in cold water. Consider this if you anticipate a long wait before power is restored.
  • Most customers with Photovoltaic (PV) solar array systems will also experience a power outage and will not be able to use their own generated power, or export energy back into our network for safety reasons. You may like to check with your electrician or solar installer to identify if your system will still operate when mains power is not available.
  • Customers using life support medical equipment are also affected by power outages, both planned and unplanned. Refer to your emergency action plan, or create one if you haven't already done so. Contact your medical practitioner for advice if necessary. Life support fact sheets are available at www.sapowernetworks.com.au

Please note that if we are taking action to prevent or rectify an emergency or unplanned power outage we are not able to notify you in advance of an interruption to your power supply.

You are welcome to contact us on 13 12 61 if you have any queries about a planned power outage.