Planned interruptions

SA Power Networks is committed to providing a safe and reliable electricity supply for South Australians.  To do this, there are times when we need to interrupt your power supply - usually for upgrades of the electricity network to meet future demand; to ensure the quality of supply (within Australian voltage standards); to connect new customers; or for planned maintenance of the network, which minimises the risk of unplanned outages.

We make every effort to ensure information on upcoming planned work is accurate at the time published.

If you are checking for today's planned work, you will find the status to be blank.  For work today where the power has already been interrupted, please check our current power interruptions page or contact our 24 hour faults and emergencies number 13 13 66.

For upcoming work, please note that the times provided on written notifications and below are the maximum anticipated outage times. Power may be turned off later than advised, and be restored either earlier than advised or, in rare cases, later than advised if there has been a complication.

Please note, planned work may not proceed in extreme weather or due to unforeseen circumstances.

We recommend that you plan for the outage to last the entire estimated duration and register with Power@MyPlace™ for SMS updates on outages affecting your property.

Future Planned Power Interruptions

JobFeedersApproximate Start TimeAreas AffectedEstimated Number of Customers AffectedApproximate Restoration TimeReasonStatus
13021AP226C, SSD22619/07/2014 08:00020/09/2014 15:00provide a safe working environment for customers to access equipment
13192AP344E, SSD34419/07/2014 08:00020/09/2014 15:00provide a safe working environment for customers to access equipment
12211NL544B, SSD54421/07/2014 08:00022/08/2014 15:00provide a safe working environment for customers to access equipmentCancelled
13159G3602/08/2014 08:30 PEKINA202/08/2014 09:20maintain/upgrade the local electricity network
13155G3602/08/2014 09:30 MORCHARD102/08/2014 10:30maintain/upgrade the local electricity network
13158G3602/08/2014 10:31 MORCHARD
 ORROROO
202/08/2014 11:30maintain/upgrade the local electricity network
13154G3602/08/2014 13:00 MOOCKRA102/08/2014 14:00maintain/upgrade the local electricity network
11933SM350B03/08/2014 07:00 EASTWOOD
 PARKSIDE
903/08/2014 15:00maintain/upgrade the local electricity networkCancelled
6187AP529C03/08/2014 08:00 LARGS BAY1803/08/2014 15:00improve the quality and/or reliability of the power supplyCancelled
7459HH409A, SSD40903/08/2014 08:00 AULDANA
 HORSNELL GULLY
 MAGILL
 NORTON SUMMIT
 SKYE
 TERINGIE
8503/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13713CBD412N, SSD41203/08/2014 08:00 ADELAIDE
  • SOUTH TCE
1103/08/2014 15:00install new electricity infrastructureScheduled
12962ME200A, ME200C, ME200D, ME200E03/08/2014 08:00 KESWICK5203/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13623NL111Q03/08/2014 08:00 REYNELLA5003/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12003AP424E, AP424F, SSD42403/08/2014 08:00 GRANGE19303/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11091MG22, SSD19703/08/2014 08:30 PENOLA103/08/2014 15:00install new electricity infrastructureScheduled
13842HH102C04/08/2014 04:00004/08/2014 06:00improve the quality and/or reliability of the power supplyCancelled
11691PA0104/08/2014 08:00 PORT AUGUSTA6204/08/2014 11:30install new electricity infrastructureScheduled
11495MV51, SSD41304/08/2014 08:00 MCLAREN VALE
 WILLUNGA
304/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11274MTB1304/08/2014 08:00 MOUNT BARKER804/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11719ME347F04/08/2014 08:00 MARLESTON
 NETLEY
3804/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13392MB2704/08/2014 08:00 MURRAY BRIDGE
 MURRAY BRIDGE NORTH
404/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13629ME131C04/08/2014 08:00 PLYMPTON5804/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13645KI1304/08/2014 08:00 AMERICAN RIVER
 PELICAN LAGOON
 PENNESHAW
1704/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10343M8104/08/2014 08:00 WALKER FLAT1004/08/2014 15:00maintain/upgrade the local electricity networkCancelled
13737NL234A04/08/2014 08:00 PORT NOARLUNGA SOUTH4404/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13699LX7104/08/2014 08:30 MALPAS
 PARUNA
304/08/2014 11:00maintain/upgrade the local electricity networkScheduled
13321PP1204/08/2014 08:30 CRYSTAL BROOK104/08/2014 12:00improve the quality and/or reliability of the power supplyScheduled
13336KA2904/08/2014 08:30004/08/2014 12:00maintain/upgrade the local electricity networkScheduled
13065MB32, MB3404/08/2014 08:30 BURDETT
 CHAPMAN BORE
 EAST WELLINGTON
 ETTRICK
 KEPA
 MONTEITH
 MURRAY BRIDGE
 POINT MCLEAY
 TAILEM BEND
 WELLINGTON EAST
7404/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12444SD3420104/08/2014 08:30004/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13573MT1104/08/2014 08:30 SANDILANDS104/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13753AP139B04/08/2014 08:30 ATHOL PARK
 MANSFIELD PARK
 WOODVILLE GARDENS
 WOODVILLE NORTH
6304/08/2014 15:00install new electricity infrastructureScheduled
13358CV3304/08/2014 09:00 RUDALL
 VERRAN
1604/08/2014 12:00maintain/upgrade the local electricity networkScheduled
12191G3704/08/2014 09:00 BOOLEROO CENTRE104/08/2014 12:30maintain/upgrade the local electricity networkCancelled
12428AP425C04/08/2014 09:30 FLINDERS PARK104/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13734LX5104/08/2014 10:00 LOXTON3204/08/2014 14:00maintain/upgrade the local electricity networkScheduled
13702LX33, LX4804/08/2014 10:00 BUGLE HUT
 NADDA
 NANGARI
 TALDRA
 TAPLAN
 WOODLEIGH
4404/08/2014 14:30maintain/upgrade the local electricity networkScheduled
13386AP149H05/08/2014 07:30005/08/2014 12:30maintain/upgrade the local electricity networkScheduled
11664WK3105/08/2014 08:00 GOLDEN HEIGHTS
 RAMCO
 RAMCO HEIGHTS
 SUNLANDS
 WAIKERIE
19105/08/2014 13:00improve the quality and/or reliability of the power supplyScheduled
13847NL234C05/08/2014 08:00 SEAFORD5305/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13837GA0805/08/2014 08:00 WILLIAMSTOWN405/08/2014 15:00repair underground infrastructureScheduled
12984NL111P, NL115D05/08/2014 08:00 MORPHETT VALE2205/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11389PA04, SSD18705/08/2014 08:00 PORT AUGUSTA4605/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11370HH496F, HH496G, SA14, SSD407, SSD49605/08/2014 08:00 GREENWITH4505/08/2014 15:00improve the quality and/or reliability of the power supplyCancelled
13178SM349C, SSD34905/08/2014 08:00 BEDFORD PARK1405/08/2014 15:00install new electricity infrastructureScheduled
13778HH496A05/08/2014 08:00 SURREY DOWNS1205/08/2014 15:00repair underground infrastructureScheduled
13760HH130D05/08/2014 08:00 MODBURY NORTH1505/08/2014 15:00repair underground infrastructureScheduled
13756SM216A05/08/2014 08:00 HOVE
 NORTH BRIGHTON
6105/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13754SM216A05/08/2014 08:00 NORTH BRIGHTON
 WARRADALE
1505/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13752SM216A05/08/2014 08:00 NORTH BRIGHTON
 SOMERTON PARK
2205/08/2014 15:00maintain/upgrade the local electricity networkScheduled
9636SM216A, SM216B, SM410C, SSD216, SSD41005/08/2014 08:00 SOMERTON PARK22805/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12000AP424B, AP425D, SSD42405/08/2014 08:00 FINDON
 SEATON
13605/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13927HH121E05/08/2014 08:00 ATHELSTONE
 NEWTON
1305/08/2014 15:00repair underground infrastructureScheduled
13552MV3105/08/2014 08:00 MYPONGA105/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11948SD34102, SD34103, SD3420105/08/2014 08:00 PORT WAKEFIELD105/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13711HH107D05/08/2014 08:00 ENFIELD1105/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13625R3205/08/2014 08:00 ERITH305/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13662SG0705/08/2014 08:00 ASHTON
 NORTON SUMMIT
2105/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13709HH432B05/08/2014 08:00 NAILSWORTH
 SEFTON PARK
4305/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13186ME347A, ME347G, SSD34705/08/2014 08:00 RICHMOND22105/08/2014 15:30install new electricity infrastructureScheduled
13838SD35401, SD35402, SD35403, SSD419, YK04, YK1305/08/2014 08:30 STANSBURY305/08/2014 09:30maintain/upgrade the local electricity networkScheduled
11307MG13, MG3805/08/2014 08:30005/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13522CD1905/08/2014 09:00 DENIAL BAY105/08/2014 10:45improve the quality and/or reliability of the power supplyScheduled
13838SD35401, SD35402, SD35403, SSD419, YK04, YK1305/08/2014 09:31005/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13524CD1905/08/2014 11:00 DENIAL BAY105/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
9977PL12, PL33, SSD53305/08/2014 23:59 COFFIN BAY
 VERRAN
70006/08/2014 03:00maintain/upgrade the local electricity networkScheduled
13999HH496F, HH496G, SA14, SSD407, SSD49606/08/2014 00:00 GREENWITH4506/08/2014 00:00improve the quality and/or reliability of the power supplyScheduled
13542EL03, SSD42206/08/2014 08:00 ANDREWS FARM2306/08/2014 15:00install new electricity infrastructureScheduled
13642CV1606/08/2014 08:00006/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13458R14, SSD19206/08/2014 08:00 HAMPDEN206/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11277ME131C, SSD13106/08/2014 08:00 PLYMPTON5206/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13425NA0106/08/2014 08:00 NARACOORTE106/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13874HH522A06/08/2014 08:00 HOPE VALLEY
 ST AGNES
2406/08/2014 15:00repair underground infrastructureScheduled
11921AP149F, AP424D, SSD42406/08/2014 08:00 HENLEY BEACH13406/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13670BT0606/08/2014 08:00006/08/2014 15:00install new electricity infrastructureScheduled
12439SD3410206/08/2014 08:00 BOWMANS206/08/2014 15:00repair underground infrastructureScheduled
13758NL234A06/08/2014 08:00 PORT NOARLUNGA SOUTH6006/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13954MI2806/08/2014 08:00 WATTLE RANGE106/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10914KI4406/08/2014 08:00 MENZIES106/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13801MV61, SSD45606/08/2014 08:30 ALDINGA BEACH18306/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13516NL115A06/08/2014 08:30 MORPHETT VALE
 WOODCROFT
4006/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13824SM350F06/08/2014 08:30 HAWTHORN
 UNLEY PARK
106/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10475M22, M2306/08/2014 08:30 CALLINGTON
 CALOOTE
 MANNUM
 MONARTO SOUTH
 MURRAY BRIDGE
 MYPOLONGA
 PALLAMANA
 ROCKLEIGH
 TEPKO
 TUNGKILLO
 WALL FLAT
10006/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13236SM350B06/08/2014 09:30 FULLARTON
 MALVERN
 PARKSIDE
 UNLEY
106/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13219NL111C06/08/2014 09:30 CHRISTIES BEACH106/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13412MB0307/08/2014 08:00 BUCCLEUCH
 KAROONDA
 PEAKE
 SHERLOCK
2507/08/2014 11:30maintain/upgrade the local electricity networkScheduled
13883SM350G07/08/2014 08:00 KINGSWOOD3007/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12438SD3420107/08/2014 08:00 PORT WAKEFIELD107/08/2014 15:00repair underground infrastructureScheduled
13646EL03, SSD42207/08/2014 08:00 ANDREWS FARM3207/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13868HH121D07/08/2014 08:00 ATHELSTONE1107/08/2014 15:00repair underground infrastructureScheduled
13777SM411B07/08/2014 08:00 COLONEL LIGHT GARDENS
 PANORAMA
1007/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13991SA3107/08/2014 08:00 PARAFIELD GARDENS
 PARALOWIE
 SALISBURY DOWNS
94407/08/2014 15:00repair underground infrastructureScheduled
13779SM411B07/08/2014 08:00 COLONEL LIGHT GARDENS
 LOWER MITCHAM
7307/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13899SM350G, SSD35007/08/2014 08:00 KINGSWOOD3007/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12009AP424B, SSD42507/08/2014 08:00 SEATON23107/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12005HH130A, HH522C, SSD130, SSD52207/08/2014 08:00 DERNANCOURT3507/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11308MG3807/08/2014 08:00007/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13153AP146E07/08/2014 08:00 FERRYDEN PARK
 KILKENNY
6707/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13517VH2207/08/2014 08:00007/08/2014 15:00install new electricity infrastructureScheduled
13532CD2207/08/2014 08:00 PENONG807/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13023MV1307/08/2014 08:00 MCLAREN FLAT207/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13826WK4407/08/2014 08:30 BOOLGUN
 HOLDER SIDING
 MAGGEA
 WAIKERIE
1607/08/2014 11:00maintain/upgrade the local electricity networkScheduled
13920WK5107/08/2014 08:30007/08/2014 13:30maintain/upgrade the local electricity networkScheduled
13600KI1307/08/2014 08:30 BROWN BEACH107/08/2014 14:00maintain/upgrade the local electricity networkScheduled
10352CN25, CN2707/08/2014 08:30007/08/2014 14:30repair underground infrastructureScheduled
12875SD35201, SD35202, SD3520307/08/2014 08:30 BLACK POINT407/08/2014 15:00install new electricity infrastructureScheduled
7872AP424A, AP424E, AP424F, SSD42407/08/2014 08:30 GRANGE
 WEST LAKES
4707/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13475G1407/08/2014 09:00 BELALIE EAST
 CANOWIE
 CANOWIE BELT
 HALLETT
 WHYTE YARCOWIE
8507/08/2014 13:00maintain/upgrade the local electricity networkScheduled
13313HH341K07/08/2014 09:30 EVANDALE
 ST PETERS
 STEPNEY
107/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13828WK4407/08/2014 11:15 KANNI
 LOWBANK
 WAIKERIE
 WOOLPUNDA
1407/08/2014 14:30maintain/upgrade the local electricity networkScheduled
13414MB0307/08/2014 11:35 SHERLOCK207/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10352CN25, CN2707/08/2014 14:31 MENINGIE5007/08/2014 15:00repair underground infrastructureScheduled
12057SM179D, SM374C, SM402B, SSD179, SSD374, SSD40208/08/2014 00:10 EDWARDSTOWN
 MELROSE PARK
1508/08/2014 05:00maintain/upgrade the local electricity networkScheduled
12037AP424B, AP425D, SSD424, SSD42508/08/2014 08:00 FINDON
 SEATON
13608/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13886HH522A08/08/2014 08:00 ST AGNES1708/08/2014 15:00repair underground infrastructureScheduled
11914PL1508/08/2014 08:00 NORTH SHIELDS308/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13431PA1008/08/2014 08:00 WILMINGTON2008/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13435R2508/08/2014 08:00 ALMA
 SALTER SPRINGS
1208/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13875HH121C08/08/2014 08:00 ATHELSTONE1608/08/2014 15:00repair underground infrastructureScheduled
13657GU1408/08/2014 08:00 KERSBROOK18908/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13279SM374A, SM374B, SSD37408/08/2014 08:00 BLACK FOREST
 FORESTVILLE
24708/08/2014 15:00install new electricity infrastructureScheduled
13853SM350B08/08/2014 08:00 PARKSIDE5508/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12767BT0208/08/2014 08:00008/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13928EL14, SSD10408/08/2014 08:00 SMITHFIELD PLAINS5308/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12128SD3420108/08/2014 08:00 PORT WAKEFIELD608/08/2014 15:00repair underground infrastructureScheduled
13138SG0408/08/2014 08:00 BASKET RANGE508/08/2014 15:00install new electricity infrastructureScheduled
11515SM172A, SM172B, SM374E, SSD172, SSD37408/08/2014 08:00 EDWARDSTOWN
 SOUTH PLYMPTON
5908/08/2014 15:00install new electricity infrastructureScheduled
12063MV13, MV14, SSD52108/08/2014 08:30 MCLAREN FLAT2408/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12514AP226C08/08/2014 08:30 ETHELTON2208/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11505AP424A, AP424E, SSD42408/08/2014 08:30 GRANGE9908/08/2014 15:00maintain/upgrade the local electricity networkCancelled
13547CD2608/08/2014 09:00 WHITE WELL CORNER208/08/2014 11:00maintain/upgrade the local electricity networkScheduled
13534CD2308/08/2014 11:00 BOOKABIE308/08/2014 14:30improve the quality and/or reliability of the power supplyScheduled
13911PL34, SSD18810/08/2014 06:00010/08/2014 11:00improve the quality and/or reliability of the power supplyScheduled
13834CM01, CM02, CM03, CM04, CM05, CM09, CM10, CM11, CM12, CM15, CM16, CM17, CM18, CM20, CM21, CM22, CM24, CM25, CM26, CM27, CM28, CM29, CM35, CM36, CM37, PL15, PL23, PL24, PL25, PL28, PL34, PL754A, PL754B10/08/2014 06:00 BOSTON
 BROOKER
 BUTLER
 CHARLTON GULLY
 COCKALEECHIE
 COOMUNGA
 COULTA
 CUMMINS
 EDILLILIE
 GREEN PATCH
 HAWSON
 KAPINNIE
 KARKOO
 KIANA
 KOPPIO
 LIPSON
 LOUTH BAY
 MITCHELL
 MOODY
 MOUNT DRUMMOND
 MOUNT HOPE
 NORTH SHIELDS
 PEARLAH
 POINT BOSTON
 POONINDIE
 PORT LINCOLN
 PORT NEILL
 SHERINGA
 TIATUKIA
 TOOLIGIE
 TOOTENILLA
 TUMBY BAY
 UNGARRA
 WANILLA
 WARROW
 WHITES FLAT
 WHITES RIVER
 YALLUNDA FLAT
 YEELANNA
319510/08/2014 11:00repair underground infrastructureScheduled
13881CBD366H10/08/2014 08:00 ADELAIDE
  • EAST TCE
  • NORTH TCE
610/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11303AP373C, AP373G, SSD37310/08/2014 08:00 GEPPS CROSS110/08/2014 15:00maintain/upgrade the local electricity networkScheduled
3302MV12, NL234B, SSD23410/08/2014 08:00 BLEWITT SPRINGS
 MCLAREN FLAT
 MCLAREN VALE
10310/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13601ME427A10/08/2014 08:00010/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10744HH341B, SSD34110/08/2014 08:00 MAYLANDS
 NORWOOD
3510/08/2014 15:00repair underground infrastructureScheduled
13571EL14, EL23, SSD104, SSD27310/08/2014 08:00 MUNNO PARA WEST32210/08/2014 16:00improve the quality and/or reliability of the power supplyScheduled
10977AP226B, AP226C, SSD22610/08/2014 08:30 ETHELTON
 GLANVILLE
2510/08/2014 15:00maintain/upgrade the local electricity networkCancelled
12251GA02, SSD23011/08/2014 08:00 GAWLER BELT
 WILLASTON
1611/08/2014 15:00repair underground infrastructureScheduled
13736MB4311/08/2014 08:00 BORRIKA111/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13897NL234A11/08/2014 08:00 CHRISTIES BEACH3011/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12288AP424B11/08/2014 08:00 SEATON2111/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13491SA711C, SA744D, SSD711, SSD74411/08/2014 08:00 SALISBURY NORTH9011/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
12076NU1511/08/2014 08:00 STOCKWELL7911/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13298ME200F, SM374A, SSD200, SSD37411/08/2014 08:00 GOODWOOD5211/08/2014 15:00install new electricity infrastructureScheduled
13802PA0611/08/2014 08:00011/08/2014 15:00install new electricity infrastructureScheduled
11487MI1211/08/2014 08:00 BOATSWAIN POINT
 ROBE
5911/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13896NL234A11/08/2014 08:00 CHRISTIES BEACH2011/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13949KA1111/08/2014 08:30 TICKERA111/08/2014 09:30maintain/upgrade the local electricity networkCancelled
13929WK3111/08/2014 08:30 GOLDEN HEIGHTS111/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13640KI5411/08/2014 08:30 PARNDANA
 VIVONNE BAY
911/08/2014 13:00maintain/upgrade the local electricity networkScheduled
11972SG13, SG14, SSD47311/08/2014 08:30 HEATHFIELD
 STIRLING
 UPPER STURT
9811/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13563M2111/08/2014 08:30011/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11603ME131B11/08/2014 08:30 KURRALTA PARK
 PLYMPTON
1811/08/2014 15:00maintain/upgrade the local electricity networkCancelled
12594SM350F11/08/2014 08:30 HYDE PARK4511/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13483VH2111/08/2014 08:30 GOOLWA SOUTH1211/08/2014 15:00maintain/upgrade the local electricity networkCancelled
13416NL544B11/08/2014 08:30 ALDINGA611/08/2014 15:00install new electricity infrastructureScheduled
12936NL111P11/08/2014 08:30 MORPHETT VALE2511/08/2014 15:00maintain/upgrade the local electricity networkCancelled
11310MG38, SSD78211/08/2014 08:30011/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13090MV5211/08/2014 09:00 WILLUNGA311/08/2014 13:00install new electricity infrastructureScheduled
13850LX2411/08/2014 09:00 MUNDIC CREEK
 PARINGA
 WONUARRA
5311/08/2014 14:00maintain/upgrade the local electricity networkScheduled
13480G1211/08/2014 09:30 BLACK ROCK
 DAWSON
 MINVALARA
 ORROROO
 PETERBOROUGH
 UCOLTA
 YATINA
 YONGALA
7011/08/2014 14:00maintain/upgrade the local electricity networkScheduled
13501LM3312/08/2014 08:00012/08/2014 11:30maintain/upgrade the local electricity networkScheduled
12023AP424B, AP424C, SSD42412/08/2014 08:00 FULHAM GARDENS
 SEATON
15012/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11940CD05, CD20, CD2612/08/2014 08:00 CEDUNA
 CHARRA
 KOONIBBA
 PENONG
 UWORRA
 WATRABA
 WHITE WELL CORNER
7512/08/2014 15:00install new electricity infrastructureCancelled
13946SM216E12/08/2014 08:00 BRIGHTON
 HOVE
4512/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12823MV53, SSD41312/08/2014 08:00 HOPE FOREST
 WILLUNGA
 WILLUNGA HILL
 WILLUNGA SOUTH
2812/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12829MV53, SSD41312/08/2014 08:00 HOPE FOREST
 WILLUNGA
1612/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13114PA2212/08/2014 08:00 QUORN
 WILLOCHRA
3012/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13118HH496E, HH496F, SSD49612/08/2014 08:00 GOLDEN GROVE
 GOULD CREEK
4012/08/2014 15:00install new electricity infrastructureScheduled
13791ME116A12/08/2014 08:00 WAYVILLE4012/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13326SM350F, SM374A, SSD350, SSD37412/08/2014 08:00 GOODWOOD
 MILLSWOOD
29012/08/2014 15:00install new electricity infrastructureScheduled
13341SA711C, SA744D, SSD711, SSD74412/08/2014 08:00 SALISBURY NORTH28512/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13366SM216G12/08/2014 08:00 BRIGHTON5412/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13967NL234C12/08/2014 08:00 SEAFORD1312/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13968NL234C12/08/2014 08:00 SEAFORD712/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13500HH145E12/08/2014 08:00 RIDGEHAVEN7212/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13964SM410C12/08/2014 08:00 GLENELG EAST
 GLENGOWRIE
 SOMERTON PARK
2912/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13963SM216A12/08/2014 08:00 NORTH BRIGHTON
 SOMERTON PARK
1612/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13222LM5112/08/2014 08:30012/08/2014 11:30improve the quality and/or reliability of the power supplyScheduled
13701SA744C, SA744H, SSD74412/08/2014 08:30 DIREK812/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12939NL234C12/08/2014 08:30 SEAFORD2312/08/2014 15:00maintain/upgrade the local electricity networkCancelled
12193MV42, SSD15412/08/2014 08:30 MOUNT COMPASS
 NANGKITA
 TOOPERANG
6212/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12509AP424A12/08/2014 08:30 GRANGE7212/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13226LM3312/08/2014 11:40 LAMEROO212/08/2014 15:30improve the quality and/or reliability of the power supplyScheduled
11794PL2513/08/2014 08:00013/08/2014 15:00improve the quality and/or reliability of the power supplyCancelled
13926AP344E13/08/2014 08:00013/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13931AP226D, AP344E13/08/2014 08:00013/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13936SM410C13/08/2014 08:00 GLENGOWRIE8013/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13961NA2213/08/2014 08:00013/08/2014 15:00install new electricity infrastructureScheduled
11854SM172E13/08/2014 08:00 MORPHETTVILLE613/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13958NL234C13/08/2014 08:00 PORT NOARLUNGA SOUTH6913/08/2014 15:00maintain/upgrade the local electricity networkScheduled
11898NL210A, SSD120, SSD21013/08/2014 08:00 CHANDLERS HILL
 CHERRY GARDENS
 CLARENDON
613/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
13957HH496F13/08/2014 08:00 GOLDEN GROVE1013/08/2014 15:00repair underground infrastructureScheduled
12022BT3313/08/2014 08:00 WESTERN FLAT213/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12079AP424A, AP424F, SSD42413/08/2014 08:00 WEST LAKES10513/08/2014 15:00repair underground infrastructureScheduled
12484GU31, SSD17813/08/2014 08:00 MOUNT TORRENS2413/08/2014 15:00install new electricity infrastructureScheduled
13869HH496C13/08/2014 08:00 WYNN VALE913/08/2014 15:00repair underground infrastructureScheduled
12535GA48, SD3750113/08/2014 08:00 CONCORDIA
 KINGSFORD
 ROSEDALE
 SHEA-OAK LOG
4513/08/2014 15:00improve the quality and/or reliability of the power supplyScheduled
12614ME131C13/08/2014 08:00 CAMDEN PARK
 PLYMPTON
1913/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12953GA01, GA25, GA26, SSD23013/08/2014 08:00 EVANSTON
 GAWLER SOUTH
17013/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13400SM374A13/08/2014 08:00 BLACK FOREST
 MILLSWOOD
4513/08/2014 15:00install new electricity infrastructureScheduled
13717M7113/08/2014 08:00 NILDOTTIE4513/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13615KI5413/08/2014 08:00 FLINDERS CHASE
 GOSSE
 KARATTA
 PARNDANA
2213/08/2014 15:00maintain/upgrade the local electricity networkScheduled
10171HH341B, HH341E, HH341K13/08/2014 08:00 ST PETERS7913/08/2014 15:00improve the quality and/or reliability of the power supplyCancelled
12335MV4213/08/2014 08:30 MOUNT COMPASS113/08/2014 14:00maintain/upgrade the local electricity networkScheduled
11991MT0713/08/2014 08:30 POINT PEARCE
 SOUTH KILKERRAN
5413/08/2014 15:00maintain/upgrade the local electricity networkScheduled
12353MV14, SSD52113/08/2014 08:30 BLEWITT SPRINGS
 MCLAREN FLAT
413/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13761AP424A13/08/2014 08:30 GRANGE2613/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13248G0413/08/2014 09:00 WIRRABARA813/08/2014 15:00maintain/upgrade the local electricity networkScheduled
13493SM349C13/08/2014 09:30 SEACOMBE GARDENS
 SEACOMBE HEIGHTS
213/08/2014 12:30maintain/upgrade the local electricity networkScheduled
13438SM349F13/08/2014 09:30 KINGSTON PARK
 SEACLIFF
213/08/2014 12:30maintain/upgrade the local electricity networkScheduled
12135CBD366M, CBD412K, SSD345, SSD366, SSD41213/08/2014 21:00 ADELAIDE
  • WAKEFIELD ST
214/08/2014 04:00maintain/upgrade the local electricity networkScheduled

About planned work

When we plan work on our electricity network in your area, we aim to provide you with a minimum of four business days' notice.  In most instances we will send a notification card via post, or hand delivered to your letterbox.  From time to time we notify our customers via local newspapers and/or radio advertising.

If you have received an 'Interruption to your power supply' notification card, the times advised on the card are a guide only and are intended to advise the maximum time that your power could be interrupted.  You should assume that you will not have power for the entire duration of the planned work, however the power may go off later than the time advised, may come back on earlier than the time advised, or in rare cases work may go over the anticipated timeframe.

Customers can register to receive an SMS confirmation when the power is restored after a planned outage. Please visit Power@MyPlace™ for more details.

There may be occasions when we cancel scheduled work.  This could be due to major weather events such as heatwaves, bushfires or storms when crews may be assisting in other areas to restore power supply, when crews have already worked the maximum hours allowed under safety regulations, or if working temperatures exceed safety guidelines.

 

Getting updates

We regret that we are not normally able to provide advance direct notification on the rare occasions we cancel work due to the short lead time and apologise for any inconvenience this may cause.  Where possible, we will use every endeavour to provide updates about planned interruption cancellations on this page.  In the event work is cancelled, we will provide you with follow-up written advice when the work is rescheduled.

You may check the SA Power Networks website on the morning of the date you have been notified your power will be interrupted to verify if the work will proceed as planned. Updates are made daily at 8am, and on Fridays for weekend work.

We recommend you place the notification card in a visible place, such as on your refrigerator, as a reminder of when you will not have power.  Please ensure other members of your household or business, or any electrical contractor who may be conducting work at your property, are also aware of the power outage.

 

Your feedback

We regularly seek feedback from customers to improve our service. Some have suggested that conducting planned work at night when most people are asleep would be more convenient. While some work may take place at night such as along major roads or if the power outage affects an entire substation area, normally in country areas, we are unable to do this in most cases as the lighting required to undertake our work safely, and the noise levels involved in the work, would be disruptive to residents.

 

Why does the power need to be off for so long?

Due to the time taken to safely prepare our network for maintenance, there is less disruption to customers in having the power interrupted in one long period to do multiple jobs, rather than spread across multiple days. On rare occasions major projects will require multiple power outages and we notify affected customers in these situations.

 

Things to remember during a planned power outage:

  • No power means no internet and email unless you have wireless service.
  • Some phones, particularly cordless ones, may not operate.
  • Many electric garage doors and gates can be operated manually. Please check before the date of your power outage or refer to the instruction manual. If there is no manual override mechanism, you may wish to either leave the door or gate open before the power goes out, or leave items you will need to access, such as your car, outside the garage or property before the power goes out.
  • Most security systems will have back up batteries and will not be affected by a power interruption, although this will depend on factors such as the condition of the batteries. Please refer to the manual or with the installer or manufacturer to check how long the battery will provide temporary power to your security system.
  • A refrigerator will keep food cold longer if you do not open the door. Resist the temptation to open it to check the contents. This particularly applies to your freezer.
  • If the weather is hot, consider the option of visiting relatives or friends who have power, or go to a public place with air conditioning such as a library, community centre or shopping centre. Check that electrical appliances such as stoves and heaters are switched off as there is a risk of fire when power supply is restored if these are left unattended.
  • Make sure that all taps are turned off if you use an electric pressure pump. This will prevent flooding if power is restored when you are not home.
  • If water supply is from tanks or a bore, then alternatives to the normal electric pressure pump should be considered.
  • Remember continuous use of water from an electric hot water system will result in cold water. Consider this if you anticipate a long wait before power is restored.
  • Most customers with Photovoltaic (PV) solar array systems will also experience a power outage and will not be able to use their own generated power, or export energy back into our network for safety reasons. You may like to check with your electrician or solar installer to identify if your system will still operate when mains power is not available.
  • Customers using life support medical equipment are also affected by power outages, both planned and unplanned. Refer to your emergency action plan, or create one if you haven't already done so. Contact your medical practitioner for advice if necessary. Life support fact sheets are available at www.sapowernetworks.com.au

Please note that if we are taking action to prevent or rectify an emergency or unplanned power outage we are not able to notify you in advance of an interruption to your power supply.

You are welcome to contact us on 13 12 61 if you have any queries about a planned power outage.