Skip to content
Addressing Power Factor Non-Compliance at ElectraNet Connection Points Options Screening Report

The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Options Screening Report (OSR) has been prepared in accordance with clause 5.17.4(e) of the National Electricity Rules (NER) for the purpose of demonstrating why SA Power Networks believes there may be credible non-network options available on a standalone basis or significant part of a credible option to address the identified need. The closing date for submissions is 3 months from publication. Submissions close on 5 August 2024.

The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Options Screening Report (OSR) has been prepared in accordance with clause 5.17.4(e) of the National Electricity Rules (NER) for the purpose of demonstrating why SA Power Networks believes there may be credible non-network options available on a standalone basis or significant part of a credible option to address the identified need. The closing date for submissions is 3 months from publication. Submissions close on 5 August 2024.