Skip to content

Helicopter inspections provide a bird’s eye view of the network to identify any obvious faults or potential defects we might miss from the ground. Not all inspections can be done by helicopter and will be patrolled from the ground if required.

Aerial patrols also form part of our annual maintenance program to inspect our powerlines and other assets in bushfire risk areas. We do this to ensure our network is safe and reliable, and meets the higher demand for power in the warmer months.

Risks we look for include:

  • vegetation close to powerlines
  • birds’ nests
  • low hanging powerlines
  • damaged equipment.
     

Using a helicopter also reduces the impact on properties as there’s no need to drive through paddocks or crops. We recommend moving livestock from paddocks with powerlines when we’re doing inspections in your area, as the helicopter may hover at low heights.


Dates of powerline inspections by helicopter

We conduct aerial inspections of powerlines across different regions of South Australia according to the schedule below. Powerline inspections via helicopter typically start from mid-May and will be completed prior to the start of the CFS fire danger season dates. Please note that dates are approximate and are subject to change.

See a map and indicative schedule for 2026 inspection dates in your region below.

Want to be notified when we’re flying in your area?
Sign up for SMS updates at and we’ll send you a message reminding you when we are flying over your area.

Aerial Inspections Map 2026

Picture: SA Power Networks' Aerial Inspections Map 2026.

Eyre and Upper North 

District Date*
Ceduna 4 May - 17 May
Cleve 1 June - 21 June
Cummins 22 June - 5 July
Hawker 25 May - 31 May
Port Augusta  25 May - 31 May
Port Lincoln  6 July - 12 July
Streaky Bay  18 May - 31 May
Wudinna  4 May - 24 May

 

Fleurieu and Barossa

District Date*
Gawler 3 August - 16 August
Kangaroo Island 28 September - 11 October
Mclaren Vale 21 September - 27 September
Nuriootpa 20 July - 2 August
Strathalbyn 28 September - 11 October
Victor Harbor 28 September - 11 October

 

Hills and Metro

District Date*
Gumeracha 12 October - 18 October
Metro 33/66kv 12 October - 18 October
Mount Barker 12 October - 18 October
Noarlunga 12 October - 18 October

 

Mid-North

District Date*
Burra 6 July - 19 July
Clare 17 August - 6 September
Gladstone 8 June - 28 June
Kadina 10 August - 23 August
Maitland 24 August - 30 August
Port Pirie 29 June - 5 July
Riverton 24 August - 27 September
Yorketown 31 August - 6 September

 

Murrayland

District Date*
Coonalpyn 3 August - 23 August
Lameroo 24 August - 6 September
Mannum 21 September - 4 October
Murray Bridge 7 September - 20 September

 

Riverland

District Date*
Barmera 13 July - 19 July
Loxton 13 July - 2 August
Waikerie 27 July - 9 August

 

South East

District Date*
Bordertown 29 June - 19 July
Millicent 18 May - 31 May
Mount Gambier 4 May - 17 May
Naracoorte 8 June - 28 June

 

* Dates are subject to change.

Not all inspections can be done by helicopter and some areas will be patrolled from the ground if required. We may need access to your property in some instances.

 

Other ways we inspect powerlines

Powerline inspections by aerial drones

Powerline inspections by robots