Looking for a specific document?
Find manuals, guidelines and standards for working on our infrastructure. Search below or try selecting a filter to narrow the results.
-
SA Power Networks Connections & Ancillary Network Services
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved Regulatory Determination for SA Power Networks.
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved Regulatory Determination for SA Power Networks.
-
Public Lighting Tariff Manual
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
-
TS105 F11 – Schneider 11kV Automated Load Switch RL Tank with ADVC Controller Test Record
TS105 F11 – Schneider 11kV Automated Load Switch RL Tank with ADVC Controller Test Record
TS105 F11 – Schneider 11kV Automated Load Switch RL Tank with ADVC Controller Test Record
-
TS133 High Voltage Embedded Generation Connection Technical Requirements
This technical standard specifies to designers, contractors, and consultants the technical requirements for embedded generation (EG) systems where the network connection is at high voltage (HV) on SA Power Networks' distribution network.
This technical standard specifies to designers, contractors, and consultants the technical requirements for embedded generation (EG) systems where the network connection is at high voltage (HV) on SA Power Networks' distribution network.
-
TS134 Communication Systems (inc. SCADA) for Embedded Generation
This technical standard specifies to designers, contractors, and consultants the technical requirements for the communication systems, including SCADA, for embedded generation (EG) systems that are connected to SA Power Networks' distribution network.
This technical standard specifies to designers, contractors, and consultants the technical requirements for the communication systems, including SCADA, for embedded generation (EG) systems that are connected to SA Power Networks' distribution network.
-
External contractors contact list
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
-
Hindley Street 66kV replacement - Ensuring Reliable Supply for the Adelaide CBD - Draft Project Assessment Report (DPAR)
Hindley Street 66kV replacement - Ensuring Reliable Supply for the Adelaide CBD.
The Hindley Street substation is one of four critical zone substations supplying the Adelaide Central Business District (CBD) and is part of the meshed 66kV metropolitan east network. It is supplied via two 66kV cables, one from Whitmore Square and one from North Adelaide / Croydon.
SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication by SA Power Networks of the options screening notice.
Hindley Street 66kV replacement - Ensuring Reliable Supply for the Adelaide CBD.
The Hindley Street substation is one of four critical zone substations supplying the Adelaide Central Business District (CBD) and is part of the meshed 66kV metropolitan east network. It is supplied via two 66kV cables, one from Whitmore Square and one from North Adelaide / Croydon.
SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication by SA Power Networks of the options screening notice.
-
TS108 Technical Standard for Indoor Equipment Room
This document specifies the minimum requirements for the design and construction of the equipment room, where equipment that is a part of the SA Power Networks distribution network is installed. The specifications in this document are applicable to all parties, whose activities are associated with the design and construction of the equipment room where SA Power Networks' equipment is located.
This document specifies the minimum requirements for the design and construction of the equipment room, where equipment that is a part of the SA Power Networks distribution network is installed. The specifications in this document are applicable to all parties, whose activities are associated with the design and construction of the equipment room where SA Power Networks' equipment is located.
-
Technical Standard - TS117 - Design and Construction near Railway and Tram Lines
Technical Standard - TS117 sets out the requirements for the design and construction of overhead and underground powerlines crossing railway and tram tracks, as well as poles and conductors located in the vicinity of these rail corridors.
Technical Standard - TS117 sets out the requirements for the design and construction of overhead and underground powerlines crossing railway and tram tracks, as well as poles and conductors located in the vicinity of these rail corridors.
-
Technical standard TS-099 - Distribution of Sub-Transmission CAD Drafting Standards
This technical standard describes and provides guidelines to ensure a consistent approach to the preparation of standard design drawings and the use of standard symbols for the SA Power Networks' electrical distribution and sub-transmission up to and including the 66kV network. It also includes details of the processes and methods to ensure effective version control and access and security of design documents through the use of Autodesk Vault.
This technical standard describes and provides guidelines to ensure a consistent approach to the preparation of standard design drawings and the use of standard symbols for the SA Power Networks' electrical distribution and sub-transmission up to and including the 66kV network. It also includes details of the processes and methods to ensure effective version control and access and security of design documents through the use of Autodesk Vault.