Looking for a specific document?
Find manuals, guidelines and standards for working on our infrastructure. Search below or try selecting a filter to narrow the results.
-
External contractors contact list
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
-
TS132 F1 - MEG Commissioning Witnessing Checklist
This document is a witnessing and commissioning checklist for Medium Embedded Generation (above 30kVA to 500kVA) units only.
This document is a witnessing and commissioning checklist for Medium Embedded Generation (above 30kVA to 500kVA) units only.
-
TS132 F2 - LEG Commissioning Witnessing Checklist
Sections within this document that have table headings that are highlighted blue, must be filled out and completed by the Customer, section table headings that are in orange will be filled out by the SA Power Networks Witnesser on the day. Please provide along with your Commissioning Plan a brief description of the method you intend to use to demonstrate each of the settings within it. This will assist should there be insufficient radiance for example on a PV system on the day of commissioning, being able to modify to suit conditions.
Sections within this document that have table headings that are highlighted blue, must be filled out and completed by the Customer, section table headings that are in orange will be filled out by the SA Power Networks Witnesser on the day. Please provide along with your Commissioning Plan a brief description of the method you intend to use to demonstrate each of the settings within it. This will assist should there be insufficient radiance for example on a PV system on the day of commissioning, being able to modify to suit conditions.
-
Final Project Assessment Report (FPAR) - Addressing Network Constraints on the Southern Outer Metro 66kV Loop
The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.
The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.
-
Technical standard TS-101 - Public Lighting - Design and Installation
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.
-
Addressing Network Constraints on the Southern Outer Metro 66kV Loop - Draft Project Assessment Report (DPAR)
SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 24 August 2023.
SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 24 August 2023.
-
Tariff Price List
This document comprises of our regulated tariff rates, tariff mapping, metering charges and associated site charges. For information regarding the application of our tariffs please refer to our Tariff Structure Statement document.
This document comprises of our regulated tariff rates, tariff mapping, metering charges and associated site charges. For information regarding the application of our tariffs please refer to our Tariff Structure Statement document.
-
Public Lighting Tariff Manual
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
The purpose of this document (Manual 21) is to outline the service offering provided by SA Power Networks for provision of public lighting services, and associated maintenance and replacement fees for ongoing management (i.e. Tariffs).
-
SA Power Networks Connections & Ancillary Network Services
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved 2020-25 Regulatory Determination for SA Power Networks.
This manual (Manual 18) outlines the list of fixed and quoted fees for Connections and Ancillary Network Services. These fees have been prepared in accordance with the AER approved 2020-25 Regulatory Determination for SA Power Networks.
-
Network Information for Customers and Contractors NICC-404-Working in the Vicinity of SA Power Networks Infrastructure - Network Access Permit Process
This document sets out the requirements for third parties performing works within vicinity to SA Power Networks infrastructure, including the Network Access Permit request process and the safe working methods and clearances.
This document sets out the requirements for third parties performing works within vicinity to SA Power Networks infrastructure, including the Network Access Permit request process and the safe working methods and clearances.