The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Draft Preliminary Assessment Report (DPAR) has been prepared in accordance with clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 15 September 2025.
The Addressing Power Factor Non-Compliance at ElectraNet Connection Points Draft Preliminary Assessment Report (DPAR) has been prepared in accordance with clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 15 September 2025.