Undergrounding powerlines - St Vincent Street, Port Adelaide

What we’re doing

We are working with the City of Port Adelaide Enfield Council to underground powerlines along St Vincent Street between Wauwa Street and Jubilee Street, Port Adelaide. We are proud to partner with the local and state government in beautifying significant areas through councils’ streetscaping initiatives.

The Department for Infrastructure and Transport will be installing new public light columns along St Vincent Street replacing the public lights connected to the redundant Stobie poles. 

How this affects you

From Monday 31 March to Monday 9 June 2025, Mahcon Civil, our civil contractor, will be trenching for the new underground network between Wauwa Street and Jubilee Street along the footpath on the Northern side of St. Vincent Street and across three road sections of St Vincent Street, extending to 2 Webster Street where we’ll lay the foundations for a new Stobie pole.

Civil work will primarily occur during the day between 7am and 5pm. Some minor civil work will be completed at night however the specific dates have not yet been scheduled.

We'll replace the Stobie pole in front of 2 Webster Street in late May with the underground cables along St Vincent and Webster Street to be installed in June. In July, we will transfer customers from the existing overhead network to the new underground network and remove all redundant low voltage overhead powerlines. We will then return in August to energise the new lighting columns and remove the redundant Stobie poles.

A limited number of private electricity connections will need to be altered as part of this project. There is no cost to those customers for this work. Our contracted licensed electrician will let you know in advance if this affects your property to arrange access and to confirm the dates of any work. 

For the duration of civil works part of the footpath on the northern side of St Vincent Street between Jubilee Street and Wauwa Street will be temporarily closed and fenced off with sign posted detours for pedestrians. Our civil contractor will also be using 13 of the 25 car parks located between 306 St Vincent Road and Wauwa Street for their equipment and vehicles, this will be a rolling carpark closure and will shift from east to west as the civil works progress. Bus stop 39 on the north side of St Vincent Street will be temporarily blocked while the civil crews are working. The transit authority will notify passengers of alternative arrangements.

To ensure everyone's safety, there will be traffic control in place with temporary speed limit reductions, detours, and potential lane closures. Our teams will work closely with those affected to minimise inconvenience.

Work hours and dates may vary due to weather conditions or unforeseen events outside of our control.

Indicative map of works to underground powerlines in Port Adelaide.

Picture: Indicative map of works to underground powerlines in Port Adelaide.

Power outages

Some customers will experience one power outage in May; there may be further outages during the cable works in July. If your power will be interrupted, we will contact you directly.

We will send SMS/emails to subscribed customers affected by any power outage two weeks in advance, at which time the outage map will also be published on our website. We post cards to non-subscribed customers however there may be delays with the postal service.

If you do not already receive free notifications about your power, you can sign up for updates via our website, or call us on 13 12 61 for assistance. You need the National Meter Identifier (NMI) from your electricity bill to subscribe.

Construction impacts

There will be noise, vibration and possibly dust associated with this work from excavation equipment, and other heavy machinery and vehicles. Our crews and contractors will minimise impacts as much as possible, however we apologise for any inconvenience and thank you for your cooperation during these works.

Further information

If you have any questions or require any further information regarding our work, please contact Kyron during business hours on 08 7326 2924 or email us at CustomerCommunication@sapowernetworks.com.au

  • General Enquires: 13 12 61
  • Interpreter service: 13 14 50
  • Postal address: GPO Box 777, Adelaide SA 5000