Addressing Network Constraints on the Southern Outer Metro 66kV Loop - Draft Project Assessment Report (DPAR)

SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 24 August 2023.

SA Power Networks has prepared this Draft Project Assessment Report (DPAR) in accordance with the requirements of clause 5.17.4 of the National Electricity Rules (NER). It is the second stage of the formal consultation process set out in the NER in relation to applying the RIT-D. This DPAR follows the publication of the Options Screening Report (OSR) by SA Power Networks. SA Power Networks has concluded that there will not be a non-network option or stand-alone power system (SAPS) option. The Closing date for submissions is 6 weeks from publication. Submissions close on 24 August 2023.