Final Project Assessment Report (FPAR) - Addressing Network Constraints on the Southern Outer Metro 66kV Loop

The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.

The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.